27.11.2012 Views

concept design san antonio river improvements project

concept design san antonio river improvements project

concept design san antonio river improvements project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MUSEUM (NORTHERN) “URBAN” REACH<br />

3. BROOKLYN AVENUE TO 9 TH STREET<br />

• Channel width to average 34 feet<br />

• Multi-use pathway on the east<br />

• Dam located midway between Brooklyn Avenue and<br />

8th Street adjacent to the San Antonio Housing<br />

Authority redevelopment and SARA property.<br />

More information on dam options found on pages 65 and 134.<br />

• Pedestrian bridge at 8th Street<br />

74 SAN ANTONIO RIVER DESIGN GUIDELINES<br />

0 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!