27.11.2012 Views

concept design san antonio river improvements project

concept design san antonio river improvements project

concept design san antonio river improvements project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MUSEUM (NORTHERN) “PARK” REACH<br />

96 SAN ANTONIO RIVER DESIGN GUIDELINES<br />

VISIONS FOR THE MUSEUM (NORTHERN) “PARK” REACH<br />

The Master Plan demonstrates the intended <strong>improvements</strong> for each segment of the Reach<br />

and how they can be accomplished. The following is a general description of the segment:<br />

1. U. S. HIGHWAY 281 TO MULBERRY STREET<br />

• Channel to remain as exists<br />

• Catalpa-Pershing creek to be restored using fluvial<br />

geomorphology principles<br />

(for the Avenue B option only – more information<br />

found in the Hike and Bike Pathways Appendix)<br />

• Pathway to extend to Avenue B and follow the<br />

restored Catalpa-Pershing creek<br />

(three other optional alignments to also be<br />

evaulated – more information found in the Hike<br />

and Bike Pathways Appendix)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!