27.11.2012 Views

concept design san antonio river improvements project

concept design san antonio river improvements project

concept design san antonio river improvements project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MUSEUM (NORTHERN) “PARK” REACH<br />

98 SAN ANTONIO RIVER DESIGN GUIDELINES<br />

2. MULBERRY STREET TO E. HILDEBRAND STREET<br />

• Channel to remain as exists<br />

• Catalpa-Pershing creek to be restored using fluvial<br />

geomorphology principles<br />

(for the Avenue B option only)<br />

• Pathway to follow the restored Catalpa-Pershing<br />

creek to the Witte Museum. More information on<br />

the pathway options found in the Hike and Bike<br />

Pathways Appendix.<br />

• Pathways to follow existing roadways within<br />

the park

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!