8.5 Structural (cont.)<br />

The removal of columns without increasing the load on other adjacent columns and<br />

piles would allow for structural revisions to the existing superstructure, without the<br />

need for work to the existing pile foundations. This will allow the lower levels, and<br />

large areas of the upper levels to remain untouched, reducing the demolition and<br />

new construction scopes.<br />

The proposed new classrooms extending beyond the east face of the Block are a<br />

significant increase the existing protruding structure. This area would require<br />

significant new construction, including new pile foundations. However, this work<br />

would be more easily achieved in this location as it is at the perimeter of the existing<br />

building, allowing for excavation and drilling without significantly impacting the main<br />

Block structure.<br />

Similar to the Tower, the structural steel mechanical penthouse could be relatively<br />

easily re-constructed to suit new mechanical requirements.<br />

� Link<br />

The proposed re-purposing of the McKimmie Library structures includes a<br />

significantly revised link. The existing two storey, structural steel framed link is<br />

designed for a 4.8 kPa live load due to use and occupancy on level 2, and for snow<br />

loading on the roof level. The ground level is a concrete slab-on-grade. This<br />

configuration does not allow for additional capacity in existing members and<br />

foundations to be realized by reduction of live loads as was accomplished in the<br />

Tower and Block structures. Significant additional capacity would be required to<br />

achieve the proposed vertical expansion of the link to match the height of the Block.<br />

Therefore, it is likely that the existing link will be removed and reconstructed in its<br />

entirety, including construction of new pile foundations. Due to the desired<br />

transparency of the new link, it can be expected that the new construction will<br />

consist of structural steel, which generally allows for a much lower and slimmer<br />

profile than concrete. New construction of the link could easily accommodate<br />

seismic design requirements of current building codes.<br />

As discussed in the Block above, it is proposed to relocate the elevator currently in<br />

the interior of the Block to the Link, at the perimeter of the Block. Elevators generally<br />

require specialized foundations. As foundation work is very difficult within an existing<br />

building, it was deemed that relocation of the elevator to the link area would allow<br />

for the necessary foundation to be constructed.<br />

8.6 Elevators<br />

Recommended and Required Upgrades<br />

RECOMMENDED UPGRADES (LOW PRIORITY) - SHORT TERM (24+ months)<br />

a) Car cab renovations - The elevator cabs of all units appear to be original and<br />

are in poor to below average condition. Car cab interior renovations will be required<br />

within the next 2 to 4 years.<br />

Total cost: $200,000<br />

Required Upgrades – long term (5-10 years)<br />

NONE<br />

Recommended Upgrades (high priority) – short term (1-2 years)<br />

b) Code compliance - voluntary upgrades - The existing elevators meet the<br />

applicable code under which they were installed; there are no outstanding<br />

mandatory retroactive code upgrades required at this time. There are, however,<br />

several features that the existing elevators do not have that are required on new<br />

elevators and installation of these devices is optional:<br />

(1)Hall door retainers and fire gibs;<br />

(2)Car door restrictors.<br />

It is recommended that these devices be installed on all elevators where necessary<br />

to ensure that the highest possible degree of safety is maintained at the site.<br />

Estimated cost $60,000 (plus taxes)<br />

Recommended Upgrades - (1-2 years)<br />

Control and fixture upgrade - Traction Elevators<br />

The existing control systems for all of the traction elevators is the original openlooped<br />

VVDC-MG relay logic based system that can be maintainable for the<br />

foreseeable future. This type of relay logic system is very maintenance intensive.<br />

Leveling accuracy of elevators with this type of control system can only be<br />

guaranteed to within +/- 3/4" under normal operating circumstances. The existing<br />

systems will provide inconsistent leveling as the system ages, regardless of normal<br />

maintenance routines, and problems will likely worsen as the expertise available in<br />

the industry to adjust this type of system becomes more and more difficult to source.<br />

The current dispatching system also utilizes mechanical relays and contact or coil<br />

failures are very difficult to troubleshoot.<br />

Plans should be made to upgrade the traction elevator control system to newer<br />

microprocessor based, closed-loop control systems. This would include replacement<br />

of controllers, new VVVF motor drives and AC motors, refurbishing of machines,<br />

installation of auxiliary braking devices, installation of compensating devices and<br />

load weighers, and replacement of hall and car fixtures with vandal proof barrier free<br />

compliant devices.<br />

The benefits of such a modernization would include: guaranteed floor leveling<br />

accuracy to within 1/4", smooth, step-less acceleration and deceleration, reduction<br />

in unscheduled shutdowns and malfunctions, reduction in waiting times for hall calls<br />

by 25 to 50 percent.<br />

Estimated cost $1,400,000 (plus tax) for all traction units<br />

<strong>CONCEPT</strong> <strong>DESIGN</strong> <strong>REPORT</strong><br />

<strong>UNIVERSITY</strong> <strong>OF</strong> <strong>CALGARY</strong><br />

MacKimmie Tower and Block I Repurposing and Renewal<br />

Tower<br />

The budget should be in the range of 450K per unit for a major upgrade, including<br />

all machine room controllers, refurbishment of gearless machines (or replacement<br />

with newer AC machines), new fixtures and cab interiors, new door operators, and<br />

all new wiring per UofC spec. Pricing would include new 3-phase disconnects and<br />

fire alarm panel tie-in’s. These would be regenerative drives also with potentially a<br />

good amount of power savings and reduced cooling requirement in machine room.<br />

To change the elevations of entrances (mechanical raised flooring option), the<br />

budget would have to be increased 100K per elevator with a minimum to a<br />

maximum of 200K if the machine room floor would need to be raised also.<br />

Would have to add approx 3-4 weeks per car for this work add on (total 15-19 week<br />

per elevator). Pricing would include all new doors and hall entrances and door locks.<br />

Block<br />

There is a need to have a minimum of 2 elevators, with one being a minimum of<br />

2500-3500 lb’s for stretcher capability. May want both elevators close to each other<br />

So if one is being serviced (or just out of service) the other can fill in.<br />

Suggestion would be 1-2500 pound passenger traction elevator and 1 - 4000-5000<br />

pound service traction elevator.<br />

Budget would be (not incl structure costs).<br />

2500 lb – 350K - time to install 12-14 weeks<br />

4000 lb – 400K - time – 13-15 weeks<br />

5000 lb – 425K - time – 14-16 weeks<br />

8. <strong>CONCEPT</strong> <strong>DESIGN</strong><br />