12.07.2015 Views

ODU MAC

ODU MAC

ODU MAC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical ArticleExample: Testing electric motors in a testing standHere the racks don´t run along a conveyor, but instead are mounted in a test stand and are pushed backand forth in the test stand. As is the case for the mobile telephones, the adaptor cables are replaced bydirect connection on the rack.High voltage testing (3 kV) of electricmotors. The adapter cable is replacedby direct connection to the rack.Figure 10Example: Climate and temperature testFigure 11 shows transport wagon with 2 x 9 frames for the seating of 18 racks, each with a test piece.Each rack has an <strong>ODU</strong>-<strong>MAC</strong>; the 18 <strong>ODU</strong>-<strong>MAC</strong> mating connectors can be seen in the transport wagon.The 18 racks with the test pieces are plugged in the wagon by hand and the wagon is driven in to theclimatic chamber.The signal and power contacts are joined together and guided out of the climatic chamber.They are joined together in one <strong>ODU</strong>-<strong>MAC</strong> connector in double DIN housing.Climatic test of frequencyconverters.Abbildung 11<strong>ODU</strong> Steckverbindungssysteme GmbH & Co. KG, Pregelstr. 11, D-84453 Mühldorf/Inn, Tel. +49/86 31/61 56-0, Fax +49/86 31/61 56 49, www.odu.de Page 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!