12.07.2015 Views

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The slurry grout mix design is conducted by preparing individual batchsamples in the laboratory and testing them with the Marsh flow cone. The batchsamples are prepared by first dry mixing the cement, sand, and fly ash in a blenderuntil thoroughly mixed. The appropriate amount of water is then added, andthe grout mixture is blended for 5 min. After the 5-min mixing period, the resinadditive is added and mixed with the grout for an additional 3 min. Immediatelyafter the 3-min mixing period, the grout is poured into the Marsh flow cone andtested for viscosity. The individual components of the grout may be adjustedwithin the prescribed tolerances to obtain a desired flow time.G - 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!