12.07.2015 Views

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C7 – UTW Smoothness Data collected in the Outside LaneDate Collected IRI (mm/m) PI (0.2" Blanking Band) (in/mi) PI (Zero Blanking Band) (in/mi)April 18, 2001 5.42* 100.03 148.28July 6, 2001 4.75** n/a n/aAugust 22, 2001 4.54** n/a n/aNote: PI data was collected in the right wheelpath using a “California Type”Profilograph with a 2’ low pass Butterworth filter.* - April 18 IRI was collected in the right wheelpath using MDOT’s ARRB TranportResearch Walking Profiler.** - July 6 & August 22 IRI is the average IRI of both wheelpaths collected usingMDOT’s High Speed “South Dakota Type” Profiler.Table C8 – UTW Friction Data collected in the Outside LaneDate Collected Skid No Avg Speed (mph) Temp (F) Time (CST)April 19, 2001 38.2 37.5 41 4:02 AMApril 19, 2001 36.8 39.2 44 4:05 AMApril 19, 2001 36.7 40.2 44 4:08 AMApril 19, 2001 35.6 40.3 44 4:10 AM36.8May 1, 2001 31.8 39.3 66 3:19 AMMay 1, 2001 33.0 39.3 66 3:25 AMMay 1, 2001 34.7 39.3 66 3:45 AM33.2July 6, 2001 32.6 38.1 n/a 3:57 AMJuly 6, 2001 33.2 38.3 73 4:02 AMJuly 6, 2001 34.0 38.3 73 4:07 AM33.3August 22, 2001 40.8 39.7 n/a 11:00 PMAugust 22, 2001 35.3 40.7 86 11:05 PMAugust 22, 2001 37.3 40.3 84 11:09 PM37.8December 4, 2001 44.2 39.2 59 12:08 AMDecember 4, 2001 43.5 40.5 60 12:13 AMDecember 4, 2001 44.8 39.1 60 12:19 AM44.2C -5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!