12.07.2015 Views

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

After the white pigmented concrete curing compound had been applied to the freshlytined concrete surface, sawing of the 3’ x 3’ panels began. The two “Soff-cut”concrete saws began sawing panels at 1:30 pm which was approximately 4½ hoursbehind the paving screed.The cross cut spacers were utilized for sawing in phase II of the UTW section.Construction of the outside thru lane was completed at 7:30 pm.The newly constructed UTW in the outside thru lane was allowed to cure forapproximately 48 hours and was opened to traffic at 12 pm on April 12, 2001.A complete listing of the California type profilograph, high speed profiler and surfacefriction data for the UTW section appears in Appendix C.Cost data for the construction of the UTW section appears in Appendix I.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!