12.07.2015 Views

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

Resin Modified Pavement Demonstration Project.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

tion. Also, remove wooden battens and clean off excess grout in theseareas with square-blade shovels, stiff-bristled brooms, and/or squeegees.h. Once the surface sheen has disappeared from the freshly grouted RMPsurface, apply curing compound in a manner and in amounts similar tothat for standard PCC pavement.Operation and MaintenanceOperations and maintenance on an RMP are similar to that of a PCCpavement. Under normal circumstances, the only joints for an RMP surfacingwill be those between the RMP material and any adjacent PCC pavement orbuilding. Any cracks that may develop should remain hairline-sized, thus requiringvirtually no maintenance efforts. Slight wearing off of the surface groutis normal and actually improves skid resistance. The life expectancy of an RMPsurfacing should be approximately 15 to 25 years, depending heavily upon theperformance of the underlying pavement layers.Service and Support RequirementsA representative of the Airfields and <strong>Pavement</strong>s Division, GeotechnicalLaboratory (GL), WES, should be consulted in the planning and designing of anRMP project. It is recommended that the job-mix-formula for the open-gradedbituminous mixture and the mixture proportions for the grout be produced and/orapproved by the appropriate WES representative. Besides theserecommendations, no other special services or support is required to implementor maintain this technology.Performance MonitoringInstallation personnel can monitor and measure the performance of the RMPsurfacing by making periodic inspections of the pavement for signs of distress(cracking, raveling, rutting, etc.). This monitoring of performance would be nomore than that required for any AC pavement. The performance monitoring canbe adjusted to fit into existing pavement management systems. The uniquedesign and combination of materials do not allow for RMP to be classified as atypical flexible or rigid pavement system, however. This factor will require anindependent pavement classification or category when including an RMP surfacingin a pavement management system.G - 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!