12.07.2015 Views

The NCEP Climate Forecast System Reanalysis - NOAA National ...

The NCEP Climate Forecast System Reanalysis - NOAA National ...

The NCEP Climate Forecast System Reanalysis - NOAA National ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

was required prior to the introduction of those historical instruments in the CFSR. Adetailed explanation of this important step is given in Appendix D.Examples of the bias correction values actually applied to the CFSR over theTOVS period of the CFSR, 1979-1998, may be seen in global averaged, 4 times dailyaveraged time series for MSU channels 1-4 and SSU channels 1-3 in Figure 27. (<strong>The</strong>spin-up of the SSU channels was done at the same time). <strong>The</strong> one measure of thesuccessful spin-up procedures is the lack of discontinuities in the transitions betweensuccessive instruments. <strong>The</strong> break in the MSU time series are a result of the recalibrationthat was applied beginning in 1986 as noted in section 2.4.2.3.1.5 Transition to Real Time CFSROnce CFSR stream 4 (see section 8 for execution layout) completed February 2009, adecision point was reached. <strong>The</strong> operational GSI had gone through several upgradesduring the CFSR execution, the latest in February being a major addition to the CRTM tosimulate the hyper-spectral channels of the IASI instrument, onboard the new ESAMETOP satellite. <strong>The</strong> IASI radiances had become operational in March 2009.In order to continue to meet the goal of providing the best available initial conditions tothe CFS, in the absence of staff and resources to maintain the CFSR GSI into the future,it was decided to make the transition to the CDAS mode of CFSR. <strong>The</strong> operational GSI,present and future implementations, would replace the CFSR GSI, and the coupledprediction model would be “frozen” to that of the CFS v2. Historical observationaldatasets would be replaced with the operational data dumps. One consequence of theswitch to the operational GSI would be, because the anticipated operationalimplementation of FOTO did not happen, the period of March 2009 forward would berun without FOTO.3.1.6 QBO problem in the GSI<strong>The</strong> QBO can only be fully depicted in assimilation systems by sufficient direct windobservations, since the underlying physical mechanism is based on the dissipation ofupwardly propagating gravity waves (Lindzen and Holton, 1968) which filtered out by- 21 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!