SE-10 <strong>Storm</strong> Drain Inlet ProtectionThe following BMPs shall be installed / utilized during paving operations:NS-3 Paving and Grinding OperationsThe following BMPs shall be installed / utilized during concrete operations:NS-12 Concrete CuringNS-13 Concrete FinishingWM-8 Concrete Waste ManagementThe following BMPs shall be installed / utilized during slope stabilization operations:EC-6 Straw Mulch/Hydroseed/Tackifier/Soil AmendmentEC-7 Geotextiles & Mats (biodegradable option)All BMPs, except those designated as post-construction BMPs in Section 3.4, are to be removed prior tocontract acceptance.3.2 Erosion & Sediment Control Best Management PracticesAppendix E provides BMP Fact Sheets on design and implementation guidelines for each BMP to reduce oreliminate pollutants in stormwater discharges. All BMPs are required to be implemented.The following BMPs are to be incorporated into this <strong>SWPPP</strong>:EC-1 SchedulingEC-2 Preservation <strong>of</strong> Existing VegetationEC-6 Straw Mulch/Hydroseed/Tackifier/Soil AmendmentEC-7 Geotextiles & Mats (biodegradable option)EC-10 Velocity Dissipation DevicesSE-1 Silt FenceSE-5 Fiber RollsSE-7 Street Sweeping and VacuumingSE-10 <strong>Storm</strong> Drain Inlet ProtectionWM-3 Stockpile Management3.3 Non-<strong>Storm</strong>water and Material Management Best Management PracticesNon-storm water discharges may contribute significant pollutant loads to receiving waters. Measures to controlspills, leakage, and dumping, and to prevent illicit connections during construction must be addressed throughstructural as well as non-structural Best Management Practices (BMPs).BMPs are designated in this <strong>SWPPP</strong> to prevent non-stormwater discharges. All BMPs are required to beimplemented.WE-1 Wind Erosion ControlTC-1 Stabilized Construction Entrance/ExitNS-1 <strong>Water</strong> Conservation PracticesNS-3 Paving and Grinding OperationsNS-6 Illicit Connection/DischargeNS-9 Vehicle and Equipment FuelingNS-10 Vehicle & Equipment MaintenanceNS-12 Concrete CuringNS-13 Concrete FinishingWM-1 Material Delivery/StorageWM-2 Material UseWM-4 Spill <strong>Prevention</strong> and ControlWM-5 Solid Waste ManagementWM-6 Hazardous Waste ManagementWM-8 Concrete Waste ManagementMunicipal <strong>Water</strong> Well No. 11 and Transmission <strong>Water</strong> Main – <strong>SWPPP</strong> July 20, 2010Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!