12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Orderg. All construction-related equipment, materials and any temporaryBMPs no longer needed are removed from <strong>the</strong> site.2. The discharger shall certify that final stabilization conditions aresatisfied in <strong>the</strong>ir NOT. Failure to certify shall result in continuation <strong>of</strong>permit coverage and annual billing.3. The NOT must demonstrate through photos, RUSLE or RUSLE2, orresults <strong>of</strong> testing and analysis that <strong>the</strong> site meets all <strong>of</strong> <strong>the</strong> conditionsabove (Section II.D.1) and <strong>the</strong> final stabilization condition (SectionII.D.1.a) is attained by one <strong>of</strong> <strong>the</strong> following methods:a. “70% final cover method,” no computational pro<strong>of</strong> requiredOR:b. “RUSLE or RUSLE2 method,” computational pro<strong>of</strong> requiredOR:c. “Custom method”, <strong>the</strong> discharger shall demonstrate in some o<strong>the</strong>rmanner than a or b, above, that <strong>the</strong> site complies with <strong>the</strong> “finalstabilization” requirement in Section II.D.1.a.2009-0009-DWQ 19 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!