12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance, Inspection, and Repair Program<strong>of</strong> Construction Site BMPsThe contractor shall use <strong>the</strong> following guidelines for maintenance, inspection, and repair <strong>of</strong> BMPs identified in <strong>the</strong> <strong>SWPPP</strong> incombination with <strong>the</strong> Field Log Sheets.All BMPs must be inspected in accordance with <strong>the</strong> General Permit requirements for <strong>the</strong> associated project type andrisk level 2. In <strong>the</strong> event <strong>of</strong> a BMP failure or shortcoming, design changes to <strong>the</strong> BMP must be madeto avoid a potential violation.BEST MANAGEMENT PRACTICES INSPECTION FREQUENCYMAINTENANCE/REPAIR PROGRAM(BMPs)(all controls)TEMPORARY EROSION CONTROL BMPsEC01: Site Scheduling/ PhasingEC02: Preservation <strong>of</strong> ExistingVegetationEC06: Straw Mulch/Hydroseed/Tackifier/Soil AmendmentPrior to commencement <strong>of</strong>associated activities.Prior to commencement <strong>of</strong>associated activities.Prior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.• Follow sequencing within <strong>SWPPP</strong>. Ifsequencing is different than <strong>the</strong> <strong>SWPPP</strong>,those modifications must be written into<strong>the</strong> plan prior to <strong>the</strong> construction activity.• Update <strong>the</strong> erosion and sediment controlplan / <strong>SWPPP</strong> if different erosion andsediment controls are installed, o<strong>the</strong>r thanwhat is shown on <strong>the</strong> plan.• Adjust timing <strong>of</strong> construction activity ifcontractor schedules change, or if wea<strong>the</strong>rpatterns become unfavorable.• Verify that protective measures remain inplace.• Restore damaged protection measuresimmediately.• Repair areas where erosion is evident with areapplication as soon as possible.• Inspect longevity <strong>of</strong> straw mulch andtackifiers in achieving erosion control.• Maintain an unbroken, temporary mulchedground cover while disturbed soil areas areinactive. Repair any damaged ground coverand remulch exposed areas.• Reapplication <strong>of</strong> straw mulch and tackifiermay be required.• If seed is used, irrigation may be needed toestablish vegetation.• Irrigation systems should be inspected formalfunctions, line breaks and coverage.• Where seeds fail to germinate, <strong>the</strong> areamust be re‐seeded within <strong>the</strong> plantingseason.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!