12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Order55. This General Permit establishes a 5 year, 24 hour (expressed in inches<strong>of</strong> rainfall) Compliance <strong>Storm</strong> Event exemption from <strong>the</strong> technologybasedNELs for Risk Level 3 dischargers.Determining Compliance with Numeric Limitations56. This General Permit sets a pH NAL <strong>of</strong> 6.5 to 8.5, and a turbidity NAL <strong>of</strong>250 NTU. The purpose <strong>of</strong> <strong>the</strong> NAL and its associated monitoringrequirement is to provide operational information regarding <strong>the</strong>performance <strong>of</strong> <strong>the</strong> measures used at <strong>the</strong> site to minimize <strong>the</strong>discharge <strong>of</strong> pollutants and to protect beneficial uses and receivingwaters from <strong>the</strong> adverse effects <strong>of</strong> construction-related storm waterdischarges. The NALs in this General Permit for pH and turbidity arenot directly enforceable and do not constitute NELs.57. This General Permit requires dischargers with NAL exceedances toimmediately implement additional BMPs and revise <strong>the</strong>ir <strong>Storm</strong> <strong>Water</strong><strong>Pollution</strong> <strong>Prevention</strong> <strong>Plan</strong>s (<strong>SWPPP</strong>s) accordingly to ei<strong>the</strong>r preventpollutants and authorized non-storm water discharges fromcontaminating storm water, or to substantially reduce <strong>the</strong> pollutants tolevels consistently below <strong>the</strong> NALs. NAL exceedances are reported in<strong>the</strong> State <strong>Water</strong> Boards SMARTS system, and <strong>the</strong> discharger isrequired to provide an NAL Exceedance Report when requested by aRegional <strong>Water</strong> Board.58. If run-on is caused by a forest fire or any o<strong>the</strong>r natural disaster, <strong>the</strong>nNELs do not apply.59. Exceedances <strong>of</strong> <strong>the</strong> NELs are a violation <strong>of</strong> this Permit. This GeneralPermit requires dischargers with NEL exceedances to implementadditional monitoring, BMPs, and revise <strong>the</strong>ir <strong>SWPPP</strong>s accordingly.Dischargers are required to notify <strong>the</strong> State and Regional <strong>Water</strong>Boards <strong>of</strong> <strong>the</strong> violation through <strong>the</strong> State <strong>Water</strong> Boards SMARTssystem, and provide an NEL Violation Report sharing additionalinformation concerning <strong>the</strong> NEL exceedance.I. Receiving <strong>Water</strong> Limitations60. This General Permit requires all enrolled dischargers to determine <strong>the</strong>receiving waters potentially affected by <strong>the</strong>ir discharges and to complywith all applicable water quality standards, including any more stringentstandards applicable to a water body.J. Sampling, Monitoring, Reporting and Record Keeping61. Visual monitoring <strong>of</strong> storm water and non-storm water discharges isrequired for all sites subject to this General Permit.2009-0009-DWQ 10 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!