12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Orderb. Changes to Authorization. If an approved signatory’s authorizationis no longer accurate, a new authorization satisfying <strong>the</strong>requirements <strong>of</strong> paragraph (a) <strong>of</strong> this section must be submitted viaSMARTS prior to or toge<strong>the</strong>r with any reports, information orapplications to be signed by an approved signatory.2. All Annual Reports, or o<strong>the</strong>r information required by <strong>the</strong> General Permit(o<strong>the</strong>r than PRDs and NOTs) or requested by <strong>the</strong> Regional <strong>Water</strong>Board, State <strong>Water</strong> Board, U.S. EPA, or local storm watermanagement agency shall be certified and submitted by <strong>the</strong> LRP or<strong>the</strong> LRP’s approved signatory as described above.J. CertificationAny person signing documents under Section IV.I above, shall make <strong>the</strong>following certification:"I certify under penalty <strong>of</strong> law that this document and all attachments wereprepared under my direction or supervision in accordance with a systemdesigned to assure that qualified personnel properly ga<strong>the</strong>r and evaluate<strong>the</strong> information submitted. Based on my inquiry <strong>of</strong> <strong>the</strong> person or personswho manage <strong>the</strong> system or those persons directly responsible forga<strong>the</strong>ring <strong>the</strong> information, to <strong>the</strong> best <strong>of</strong> my knowledge and belief, <strong>the</strong>information submitted is, true, accurate, and complete. I am aware that<strong>the</strong>re are significant penalties for submitting false information, including<strong>the</strong> possibility <strong>of</strong> fine and imprisonment for knowing violations."K. Anticipated NoncomplianceThe discharger shall give advance notice to <strong>the</strong> Regional <strong>Water</strong> Board andlocal storm water management agency <strong>of</strong> any planned changes in <strong>the</strong>construction activity, which may result in noncompliance with GeneralPermit requirements.L. BypassBypass 8 is prohibited. The Regional <strong>Water</strong> Board may take enforcementaction against <strong>the</strong> discharger for bypass unless:1. Bypass was unavoidable to prevent loss <strong>of</strong> life, personal injury orsevere property damage; 98 The intentional diversion <strong>of</strong> waste streams from any portion <strong>of</strong> a treatment facility9 Severe property damage means substantial physical damage to property, damage to <strong>the</strong> treatmentfacilities that causes <strong>the</strong>m to become inoperable, or substantial and permanent loss <strong>of</strong> natural resources thatcan reasonably be expected to occur in <strong>the</strong> absence <strong>of</strong> a bypass. Severe property damage does not meaneconomic loss caused by delays in production.2009-0009-DWQ 25 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!