12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OrderUse <strong>of</strong> an ATS can effectively reduce a site's risk <strong>of</strong> impactingreceiving waters.51. Dischargers located in a watershed area where a Total Maximum DailyLoad (TMDL) has been adopted or approved by <strong>the</strong> Regional <strong>Water</strong>Board or U.S. EPA may be required by a separate Regional <strong>Water</strong>Board action to implement additional BMPs, conduct additionalmonitoring activities, and/or comply with an applicable waste loadallocation and implementation schedule. Such dischargers may alsobe required to obtain an individual Regional <strong>Water</strong> Board permitspecific to <strong>the</strong> area.H. Effluent Standards52. The State <strong>Water</strong> Board convened a blue ribbon panel <strong>of</strong> storm waterexperts that submitted a report entitled, “The Feasibility <strong>of</strong> NumericEffluent Limits Applicable to Discharges <strong>of</strong> <strong>Storm</strong> <strong>Water</strong> Associatedwith Municipal, Industrial and Construction Activities,” datedJune 19, 2006. The panel concluded that numeric limits or actionlevels are technically feasible to control construction storm waterdischarges, provided that certain conditions are considered. The panelalso concluded that numeric effluent limitations (NELs) are feasible fordischarges from construction sites that utilize an ATS. The State<strong>Water</strong> Board has incorporated <strong>the</strong> expert panel’s suggestions into thisGeneral Permit, which includes both numeric action levels (NALs) andNELs for pH and turbidity, and special numeric limits for ATSdischarges.Numeric Effluent Limitations53. Discharges <strong>of</strong> storm water from construction activities may becomecontaminated from alkaline construction materials resulting in high pH(greater than pH 7). Alkaline construction materials include, but arenot limited to, hydrated lime, concrete, mortar, cement kiln dust (CKD),Portland cement treated base (CTB), fly ash, recycled concrete, andmasonry work. This General Permit includes an NEL for pH (6.0-9.0)that applies only at sites that exhibit a "high risk <strong>of</strong> high pH discharge."A "high risk <strong>of</strong> high pH discharge" can occur during <strong>the</strong> completeutilities phase, <strong>the</strong> complete vertical build phase, and any portion <strong>of</strong>any phase where significant amounts <strong>of</strong> materials are placed directlyon <strong>the</strong> land at <strong>the</strong> site in a manner that could result in significantalterations to <strong>the</strong> background pH <strong>of</strong> any discharges.54. For Risk Level 3 discharges, this General Permit establishestechnology-based, numeric effluent limitations (NELs) for turbidity <strong>of</strong>500 NTU. Exceedances <strong>of</strong> <strong>the</strong> turbidity NEL constitutes a violation <strong>of</strong>this General Permit.2009-0009-DWQ 9 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!