12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance, Inspection and Repair ProgramThe contractor shall use <strong>the</strong> following guidelines for maintenance, inspection, and repair <strong>of</strong> BMPs identified in <strong>the</strong> <strong>SWPPP</strong> incombination with <strong>the</strong> Field Log Sheets.All BMPs must be inspected in accordance with <strong>the</strong> General Permit requirements for <strong>the</strong> associated project type andrisk level 2. In <strong>the</strong> event <strong>of</strong> a BMP failure or shortcoming, design changes to <strong>the</strong> BMP must be madeto avoid a potential violation.BEST MANAGEMENT PRACTICES INSPECTION FREQUENCYMAINTENANCE/REPAIR PROGRAM(BMPs)(all controls)SE05: Fiber RollsSE10: <strong>Storm</strong> Drain Inlet ProtectionPrior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.Prior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.• Ensure <strong>the</strong> rolls remain anchored in placeand are not damaged or wea<strong>the</strong>red.• Repair or replace ripped, split, unraveled, orwea<strong>the</strong>red fiber rolls within 24 hours <strong>of</strong>discovery.• Remove sediment when accumulationreaches 1/3 <strong>of</strong> <strong>the</strong> rolls height. Sedimentremoved may be spread into <strong>the</strong> earthwork<strong>of</strong> <strong>the</strong> site or be disposed <strong>of</strong> at anappropriate location. Do not place collectedsediment in a place where it will wash intoditches, channels, or streams.• Fiber rolls can be removed or left in placeafter vegetation is established. Over time<strong>the</strong>y decompose into mulch and <strong>the</strong> nettingbreaks into smaller pieces.• Remove accumulated sediment when <strong>the</strong>sediment reaches ½ <strong>of</strong> <strong>the</strong> barrier height.• Replace or repair protection as needed.WE01: Wind Erosion ControlSE07: Vacuum Type SweeperWIND EROSION CONTROL BMPsPrior to commencement <strong>of</strong>associated activities, verify thatBMPs are in place and weekly.TRACKING CONTROL BMPsDaily during non‐hauling events,hourly during hauling events andweekly.• Observe air quality to ensure BMPs areadequate.• Observe traffic speed limits and enforcespeed limits on‐site.• Inspect site to ensure minimal soil surfacesare exposed; employ temporary cover BMPsas needed.• Inspect soil surfaces and ensure surfaces arescarified.• Scrape and sweep within 24 hours <strong>of</strong>detecting sediment tracking.• Properly dispose <strong>of</strong> vacuumed materialsaccording to local regulations.• Sweep multiple times per day, if necessaryduring continuous or frequent haulingactivities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!