12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Maintenance, Inspection and Repair ProgramThe contractor shall use <strong>the</strong> following guidelines for maintenance, inspection, and repair <strong>of</strong> BMPs identified in <strong>the</strong> <strong>SWPPP</strong> incombination with <strong>the</strong> Field Log Sheets.All BMPs must be inspected in accordance with <strong>the</strong> General Permit requirements for <strong>the</strong> associated project type andrisk level 2. In <strong>the</strong> event <strong>of</strong> a BMP failure or shortcoming, design changes to <strong>the</strong> BMP must be madeto avoid a potential violation.BEST MANAGEMENT PRACTICES INSPECTION FREQUENCYMAINTENANCE/REPAIR PROGRAM(BMPs)(all controls)EC07 Geotextiles and MatEC10: Velocity Dissipation DevicesPrior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.Prior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.• Inspect that geotextile maintains anunbroken groundcover, and is uniformily incontact with <strong>the</strong> soil.• Repair and reapply as soon as possiblewhere erosion is evident.• Ensure that all lap joint are secure andstaples are flush with <strong>the</strong> ground.• Inspect apron for displacement <strong>of</strong> riprap anddamage to underlying fabric. Repair fabricand replace riprap.• Inspect for scour beneath <strong>the</strong> riprap andaround <strong>the</strong> outlet. Repair damage to slopesor underlying filter fabric immediately.SE01: Silt FenceTEMPORARY SEDIMENT CONTROL BMPsPrior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.• Repair any undercut or scoured areasimmediately.• Repair or replace any split, torn, collapsed,or decomposed silt fence fabric within 24hours <strong>of</strong> discovery.• All sediment deposits must be periodicallyremoved in order to maintain effectiveness.Remove silt deposits once <strong>the</strong>y reach 1/3 <strong>the</strong>barrier height. Sediment removed may bespread into <strong>the</strong> earthwork <strong>of</strong> <strong>the</strong> site or bedisposed <strong>of</strong> at an appropriate location. Donot place collected sediment in a placewhere it will wash into ditches, channels, orstreams.• Do not remove silt fences until <strong>the</strong> disturbedarea has established permanent vegetation.• Immediately repair any disturbances (suchas holes or depressions) created whileremoving <strong>the</strong> silt fence.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!