12.07.2015 Views

Series 90-70 Genius Bus Controller Manual, GFK-2017

Series 90-70 Genius Bus Controller Manual, GFK-2017

Series 90-70 Genius Bus Controller Manual, GFK-2017

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3Add GBCs for <strong>Genius</strong> Redundancy: Dual <strong>Bus</strong> One PLCSelect Dual <strong>Bus</strong> One PLC if there are two busses, each of which has its own <strong>Bus</strong><strong>Controller</strong>. The <strong>Bus</strong> <strong>Controller</strong>s are in the same PLC, but can be located in differentracks. Switching devices, usually <strong>Genius</strong> <strong>Bus</strong> Switching Modules (BSMs), each link upto seven additional devices to the dual busses. All <strong>Genius</strong> devices downstream of abus switching device must be configured for BSM Present.CPU<strong>Bus</strong><strong>Controller</strong><strong>Bus</strong><strong>Controller</strong>BUS ABUS BBSMBSMCONTROLLERBLOCKUP TO 7 MOREBLOCKS1. In the Redundancy wizard, select: Add GBCs for <strong>Genius</strong> Redundancy, then Dual<strong>Bus</strong> One PLC:2. Click Next.3. Select rack and slot locations for the primary <strong>Bus</strong> <strong>Controller</strong> and the paired <strong>Bus</strong><strong>Controller</strong>. On a PACSystems RX7i, if you cannot select the expansion rack youwant, you need to add it to the rack system.<strong>GFK</strong>-<strong>2017</strong> Chapter 3 <strong>Bus</strong> <strong>Controller</strong> Configuration 3-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!