12.07.2015 Views

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 2011 119 12619The initial impact for surface water is VERY LOW, occurs in Isolated sites / proposed site and willbe Medium Term and It’s going to happen / has occurred. This results in a rating of 1.6 or a Lowimpact class.Additional ImpactThe <strong>co</strong>nstruction of the proposed power lines should have no affect on drainage lines because ofthe distance between pylons, but it should be noted that many drainage, streams, rivers andwetlands cross over the proposed and existing lines. It is re<strong>co</strong>mmended that buffer zones shouldbe in place to project sensitive aquatic areas.Waste generated during the <strong>co</strong>nstruction phase may enter the environment through surface waterrunoff i.e. litter or pollution such as hydrocarbons can be washed into aquatic systems affectingthose systems negatively. Storm-water flowing over the site will also mobilise loose sediments,which may enter the surface water environment affecting water quality. Storm-water <strong>co</strong>ntainingsediment can be discharged to grassland buffers to ensure sediments fall out prior to waterentering surface water bodies. Care must be taken that storm-water <strong>co</strong>ntaining hydrocarbons andother pollution sources are not discharged.Table 12-10: Surface water Additional-Impact Rating ScaleImpact Significance Spatial Scale Temporal Probability RatingScaleImpact toSurfaceVERY LOW Isolated sites /proposed siteMediumTermCouldHappenVeryLowwater1 1 3 3 1The additional impact for surface water is VERY LOW, occurs in Isolated sites / proposed site, willbe Long Term and Could Happen to occur. This results in a rating of 1 or a Very Low impact class.Cumulative ImpactThe cumulative impact of the current activities and the future activities will not increase the impactrating from a Low Impact as rated in the initial impact assessment.Mitigation MeasuresÜÜÜÜNo <strong>co</strong>nstruction camps or pylons should be placed within 50m from the edge of a surfacewater body.Demarcated areas where waste can be safely <strong>co</strong>ntained and stored on a temporary basisduring the <strong>co</strong>nstruction phase should be provided at the hard park;Waste is not to be buried on site;Hydro-carbons should be stored in a bunded storage area;ZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!