12.07.2015 Views

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 2011 127 1261914 CONCLUSIONIn <strong>co</strong>nclusion the proponent proposes to <strong>co</strong>nstruct and operate a 765 kV power line in orderto <strong>co</strong>nnect the Camden Power Station to the Mbewu substation in Empangeni.<strong>Zitholele</strong> Consulting was appointed to screen the biophysical aspects and stakeholdersensitivities of the proposed routes. The aspects investigated include soils, agriculturalpotential, wetland, surface water, terrestrial e<strong>co</strong>logy and visual impacts.It was found that the major areas of <strong>co</strong>ncern were the sensitive fauna and flora, loss oftourism potential and sense of place and loss of agricultural land. Most of the elementsanalysed indicate that the impacts from Alternative 2 will be larger than the other 2alternatives.Comments and inputs received from stakeholders and authorities indicated that routes BK,KD, AM, AP, NO and PO should be avoided in order to avoid protected areas andsensitivities along the proposed routes.It is re<strong>co</strong>mmended that Alternative 1 (AB-BC-CD-DE-EF2-FG-SGH-HI-IJ) be the preferredalternative with Alternative 3 being a possible alternative if there are any problems identifiedin the other specialist studies. It should be noted that the main impact from the proposedalternative will be in the cane producing area to the west of Empangeni and all efforts shouldbe made to minimise this impact on the agriculture.If the line is <strong>co</strong>nstructed and operated with the mitigation measures proposed in this reportthe development will have impacts that are within the acceptable range. The need for thedevelopment is clear, but to ensure the placement of the power line in the position with thesmallest environmental impact is critical.ZITHOLELE CONSULTING (PTY) LTDKonrad KrugerWarren KokZ:\PROJECTS\12619 - EIA FOR CAMDEN THETA 765 KV POWER LINE\REPORTS\SPECIALST REPORTS\BIOPHYSICAL\CAMDEN SPES REPORT KK V3.DOCZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!