12.07.2015 Views

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

Appendix O2 - Biophysical Report.pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 2011 123 1261913 ENVIRONMENTAL MANAGEMENTThis section describes the suggested <strong>co</strong>mmitments that should be included in the Environmental Management Plan (EMP) to be <strong>co</strong>mpiled bythe environmental <strong>co</strong>nsultant responsible for the EIA.13.1 Geology and SoilsManagementGeology and SoilsComponentPrimary ObjectiveTo ensure that the soils are stockpiled in the <strong>co</strong>rrect manner to prevent erosion and <strong>co</strong>ntamination of surface water runoff.Core Criteria:Monitoring CriteriaNo blasting is undertaken on site without a suitable blast design, <strong>co</strong>mpiled in line withrelevant SANS <strong>co</strong>des and approved by an appropriately qualified professional.Avoid placement of pylon footings in the clay soils on siteSpread absorbent sand on areas where oil spills are likely to occur, such as the refuellingSite Development Plan, EMParea in the hard parkmonitoring and IntermittentOil-<strong>co</strong>ntaminated soils are to be removed to a <strong>co</strong>ntained storage area and bio-remediateobservationor disposed of at a licensed facilityIf soils are excavated for the footing placement, ensure that the soil is utilised elsewherefor rehabilitation/road building purposesEnsure that soil is stockpiled in such a way as to prevent erosion from storm water.13.2 FaunaManagementFauna – especially red data birdsZITHOLELE CONSULTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!