annual edition - 2011 - Indian Naval Hydrographic Department
annual edition - 2011 - Indian Naval Hydrographic Department
annual edition - 2011 - Indian Naval Hydrographic Department
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
354(P)/(12/08)52UNITED ARAB EMIRATES – Jazirat Das to Ras al Qila –– Submarine pipeline. (Continued)25° 09´·62N., 52° 52´·11E. Jazırat Das25° 09´·34N., 52° 50´·99E.25° 08´·40N., 52° 50´·59E.24° 58´·20N., 52° 51´·92E.24° 56´·74N., 52° 52´·72E.24° 23´·27N., 52° 56´·46E.24° 18´·50N., 52° 56´·84E.24° 15´·33N., 52° 55´·23E.24° 08´·42N., 52° 54´·05E. Ra’s al Qila2. Dredging operations along the part of the route starting at position 24° 49´·30N., 52° 53´·30E. are beingprogressed in a southerly direction crossing the Ruwais channel towards the Ghasha Field. The area of operation of thesupport vessels is limited to an area of 2 NM radius around the dredger.3. Works are expected to be completed in December 2008.4. Mariners are requested to give the dredging operation a wide berth, exercise caution when navigating in the areaand to avoid anchoring or trawling in the vicinity of the submarine pipeline.Charts affected – 20 – 289.*439(T)/(15/08)INDIA – WEST COAST – Kandla – Sogal channel – Buoy. JettySource: <strong>Hydrographic</strong> Note INS Veer(HJ/1130/29)1. It is reported that Buoy No.1 22° 52.’02 N 070° 08.’75 E is missing from its position.2. A new craft flotilla jetty has been constructed in the Kandla Creek situated south of pantheon jetty and north ofpassenger jetty, lay of berth is 356° – 176° and length of berth is 130 meters approximately.3. Mariners are advised to exercise caution and contact local port authorities for more information.4. Former INM 50(P)/05 is cancelled.Charts affected – 2080 – 2018(INT 7321) – 2059(INT 7322).*084(P)/(02/09) INDIA – WEST COAST – Sacrifice Rock to Beypore – Breakwater.Source: Port <strong>Department</strong>, Thiruvananthapuram.(HJ/1030/14)1. Two (02) in no. Breakwaters are under construction in the following Positions:–(a) 11° 25´·90N 75° 41´·60E. to 11° 25´·79N 75° 41´·42E.(b) 11° 26´·19N 75° 41´·30E. to 11° 26´·04N 75° 41´·05E.2. Mariners to exercise caution.Chart affected – 2053.*085(P)/(02/09) INDIA – LAKSHADWEEP – Plans in Lakshadweep – Kalpitti to Parali Island – Agatti – Jetty.Source: <strong>Hydrographic</strong> Note INS Sutlej(HJ/1030/07)1. A Concrete jetty is under construction on the East Coast of Agatti Island. Details of Jetty are as follows: