ECONOMIC-TECHNICALDIVISIONThe <strong>St<strong>at</strong>e</strong> <strong>Geological</strong> Institute of Dionýz Štúr is a st<strong>at</strong>e contributory organiz<strong>at</strong>ion financedfrom the <strong>St<strong>at</strong>e</strong> Budget through the Ministry of Environment SR. This affili<strong>at</strong>ionis realized through contractual contributions for projects solutions, Geofond activity andDionýz Štúr Publishers, for st<strong>at</strong>e contracts projects solutions – research-technical projectsand other projects of the Section of the Geology and N<strong>at</strong>ural Resources of the ME.The SGIDŠ incomes in the 2007 reached 180 mil. Sk. The main source were financesfrom the Ministry of Environment assigned for solution of scientific-technical projects andother projects of the Section of the Geology and N<strong>at</strong>ural Resources of the ME and foractivities in the sphere of inform<strong>at</strong>ics, issuing public<strong>at</strong>ions and maps, for the GAL activity,sample and core recovery document<strong>at</strong>ion, for Partial Monitoring System of environmentalgeofactors and Partial Monitoring system, part W<strong>at</strong>ers, totalling to 135 782 000 Sk, solutionof other projects out of the <strong>St<strong>at</strong>e</strong> Budget and for the projects solved in the scope ofintern<strong>at</strong>ional cooper<strong>at</strong>ion. All-in-all it was 27 363 000 Sk.In the scope of control of the financial contribution spent for the above activities wehave to mention the contract between ME SR and SGIDŠ, according to which the individualactivities are appreci<strong>at</strong>ed in the form of person-months and through the estim<strong>at</strong>ionof the cost for carried out works rel<strong>at</strong>ed to particular activities financed from the contribution,i.e. common transfer.The other important source for returns are receiptsfrom investments (spare space lease, prevailingly) reaching1 830 000 Sk. Through these investments the commitmentof economised and effective utilis<strong>at</strong>ion of temporaryspare st<strong>at</strong>e property, which is administered by the <strong>St<strong>at</strong>e</strong><strong>Geological</strong> Institute of Dionýz Štúr, is fulfilled. The furthersource represent the returns reaching 15 178 000 Sk.The finances were utilised in the most economic andeffective way. This was reached also thanks to further importantprojects and finances acquired.In the previous year we managed to achieve a positiveeconomic result, although the minimum one, reaching14 000 Sk. We even managed to pay remuner<strong>at</strong>ionto our employees reaching 3 098 000 Sk comprisingalso the jubilee award of 317 000 Sk.In the sphere of investments the finances were spentfor purchase of software, prevailingly, reaching a sum of3,9 mil. Sk, for purchase of comput<strong>at</strong>ional techniquealmost 4,3 mil. Sk, for machinery purchase 5,2 mil. Sk,for project document<strong>at</strong>ion and rel<strong>at</strong>ed reconstructionand additional building of storehouses for sample andcore recovery document<strong>at</strong>ion in Br<strong>at</strong>islava, totalling to 8 134 000 Sk. As a supplementarysource for repair and maintenance and reconstruction of building we spent 2 000 000 Sk.They were used for reconstruction of entry g<strong>at</strong>e of SGIDŠ in Br<strong>at</strong>islava in BukurešťskáStreet and, finally we remuner<strong>at</strong>ed the loss from the main activity for the year 2006 totallingto 9 142 000 Sk. All these works were financed partially from reproduction fund serving asa complementary source, because SGIDŠ in the year 2007 didn’t receive capital transfer.Also in the year 2007 the Institute oper<strong>at</strong>ed smoothly through the <strong>St<strong>at</strong>e</strong> Treasury System.The Institute entered this inform<strong>at</strong>ion system by July 1, 2004. The investments were providedcontinuously in accord with the mode of finances alloc<strong>at</strong>ion, budgetary amendments and inthe scope of limits and consequent finance plans in the <strong>St<strong>at</strong>e</strong> Treasury Inform<strong>at</strong>ion Systemaccording to individual programmes and functional as well as economic classific<strong>at</strong>ion.SGIDŠ budgetin the year 2007SGIDŠ real costsin the year 2007SGIDŠ returns budgetin the year 2007SGIDŠ actual returnsin the year 2007Contribution by the Ministryof Environment SRSpending of contributionSpending of contributionfulfilmentEconomic result 2007180 580 000 Sk180 478 000 Sk180 600 000 Sk180 492 000 Sk135 782 000 Sk135 782 000 SkNo. Budget Items Plan St<strong>at</strong>us100 %14 000 Sk1. I. Concepts, programmes, methodics 1 764 000 Sk 1 764 000 Sk2. II. Legisl<strong>at</strong>ive tasks 0 Sk 0 Sk3. III. Science, Research – 111 74 981 000 Sk 74 982 000 Sk4. Marketing rel<strong>at</strong>ions 367 000 Sk 367 000 Sk5. IV. Monitoring, inform<strong>at</strong>ics 53 891 000 Sk 53 890 000 Sk6. V. Editorial activity 3 500 000 Sk 3 500 000 Sk7. VI. Investments 22 000 000 Sk 15 791 000 Sk8. VII. Intern<strong>at</strong>ional cooper<strong>at</strong>ion 5 995 000 Sk 8 337 000 Sk9. Own fi nances – cofi nancing 0 Sk 1 334 000 Sk10. VIII. Other tasks 15 000 000 Sk 24 424 000 Sk11. Salaries valoris<strong>at</strong>ion 1 646 000 Sk 1 646 000 Sk12. Biased fi nances 240 000 Sk 0 SkIn Total 179 384 000 Sk 186 035 000 Sk3452112 1110St<strong>at</strong>us – Budget fulfilment6798<strong>St<strong>at</strong>e</strong> <strong>Geological</strong> Institute of Dionýz Štúr Annual Report 2007 7
ORGANIZATION UNITOF THE VICE-DIRECTOR FOR GEOLOGYVice-Director for Geology: RNDr. Eduard Lukáčik, CSc.GEOLOGICAL DIVISIONEmployees of the <strong>Geological</strong> Division perform system<strong>at</strong>ic and complex geologicalresearch of the setting of the territory of the Slovak Republic focused in:• geological research, geological mapping, compil<strong>at</strong>ion and issuing of geologicalmaps,• research of hydrogeological conditions of the territory of SR, compil<strong>at</strong>ionof hydrogeological and hydrogeochemical maps, assessment ofgroundw<strong>at</strong>ers sources, thermal, n<strong>at</strong>ural cur<strong>at</strong>ive and mineral w<strong>at</strong>ers included,• research of geothermal potential of the territory and assessment of theEarth’s Crust thermal energy sources,• engineering geological research, compil<strong>at</strong>ion of engineering geologicalmaps and environmental monitoring of environmental geological factors,• research and assessment of geological agents infl uencing the environmentand their impact upon popul<strong>at</strong>ion health st<strong>at</strong>us,• research and assessment of geological structures suitable for storage ofradioactive and other toxic wastes and CO 2,• research of n<strong>at</strong>ural laws of genesis and distribution of raw mineral sourcesand research of their technological properties.<strong>Geological</strong> Division is composed of:– Department of Crystalline and Palaeozoic(Head RNDr. Vladimír Bezák, CSc.),– Department of Mesozoic and Palaeogene(Head RNDr. Stanislav Buček, CSc.),– Department of Neogene and Qu<strong>at</strong>ernary(Head RNDr. Michal Elečko, CSc.),– Department of Hydrogeology and Geothermal Energy(Head RNDr. Peter Malík, CSc.),– Department of Engineering Geology(Head RNDr. Alena Klukanová, CSc.),– Department of Environmental Geochemistry(Head RNDr. Dušan Bodiš, CSc.),– Department of Complex Raw Mineral Assessment(Head Ing. Peter Baláž, PhD.),– Department of Geophysics and Non-Renewable Energetic Sources(Head RNDr. Igor Hrušecký, PhD.,since May 1, 2007 RNDr. Peter Kubeš, CSc.),– Department of Applied Technology of Raw Minerals – RC KE(Head Ing. Ľubomír Tuček),– Department of Isotope Geology(Head RNDr. Ján Kráľ, CSc.),– Department of Electron Microanalysis(Head RNDr. P<strong>at</strong>rik Konečný, PhD.).Besides the contractual works the employees of the <strong>Geological</strong> Division solvedin previous year geological projects from various sectors of geology.Head of the Division: RNDr. Ľudovít Kucharič, CSc.8 Annual Report 2007 <strong>St<strong>at</strong>e</strong> <strong>Geological</strong> Institute of Dionýz Štúr