12.07.2015 Views

Annual report 2010

Annual report 2010

Annual report 2010

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15. Operation and Technical PolicyOrganizational Structure of the OperationalSituation Center (OSC)Manager of theDepartment forOperational ProcessControlManager of theOperational SituationCenterAnalysis Team(2 people)Group of informers(4 people — 24 hours a day,1 person per shift)OSC Information Interchange ChartMinistry of Energy(Situation AnalysisCenter, 24/7)Managementof JSC IDGC HoldingSO UPS(24/7)JSC IDGC Holding’s OSC(24/7)FGC(24/7)Related divisionsof JSC IDGC HoldingEMERCOM(National EmergencyManagement Centre, 24/7)Roshydromet(24/7)Network ControlCenters of directlycontrolled RGCs(24/7)IDGCs’ OSCs(24/7)Network ControlCenters of IDGCs’branches (24/7)existing information interchangeplanned existing information interchangeThe main goals of JSC IDGC Holding in the areaoperational process control of electricity distributiongrid facilities in 2011 are as follows:— assumption by all NCCs of the distributiongrid companies of operational functionswithin the scope of phase I;— expansion of the scope of operational functionsperformed by the NCCs of distributiongrid companies (for the NCCs of distributiongrid companies assuming operational functionswithin the scope of phase I);— development of the Organization Standardfor Operational Process Control in theDistribution Grid Sector;— organization of work aimed at implementingthe system of temperature monitoring ofelectric grid facilities;137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!