15. Operation and Technical PolicyAverage Duration of Process Failures Related to InterruptedElectricity Supply for Consumers, hrs— replacement of the wooden towers of 6-35 kVdistribution lines with higher-than-averagedecay rate;— replacement of non-insulated wires with SIP-3 self-supporting insulated wire and theinsulated wires of 6-10 kV distribution linescrossing forests and populated areas;— reinstallation of towers from damaged foundationsonto the new ones;— installation of spiral reinforcement;— expansion of narrowed distribution lines forestcorridors (as designed);— rehabilitation of the system of capacitanceclosing ground current compensation in 6-10kV network;— creation of GPS-control for motor vehicles;— installation of additional interim towers forthe purpose of increasing the resistance ofdistribution lines to the changed conditionsof weather effects.141

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!