12.07.2015 Views

Annual report 2010

Annual report 2010

Annual report 2010

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

JSC IDGC Holding. <strong>Annual</strong> Report <strong>2010</strong>JSC IDGC of the Centerand the Volga RegionThe rehabilitation of 110 kV Suzdal substation (32MVA) was completed.The investment project was implemented for thepurpose of increasing the substation’s capacityand raising the reliability of electric power supplyto customers.Work aimed at rehabilitating the substationallowed raising the reliability of electric powersupply to the agricultural production facilities,public utilities and other customers of Suzdaland ensured the reduction of costs in connectionwith reimbursing for damage caused by theunder-delivery of electricity (a branch ofVladimirenergo).The rehabilitation of 110 kV Belkino substation(40 MVA) was finalized.The rehabilitation of the backbone supplying substationallowed ensuring reliable energy supply tocustomers from the old part of Obninsk, Signalworks, Agrisovgas, a state-of-the-art enterprise, awhole range of new small-capacity enterprisesand satisfying the growing needs of the newlybuilt facilities of Obninsk, its new central part,new institutes, industrial estate, etc (a branch ofKalugaenergo).The rehabilitation of phase II of 110 kV Fedyakovosubstation (25 MVA) was terminated.The substation is the backbone supplying substationof the Western part of Kstosvky District, largeindustrial and agricultural customers in theregion.Work aimed at rehabilitating the substationallowed ensuring reliable electric power supply tocustomers and satisfying the growing needs ofthe newly built facilities for Nizhni Novgorod andKstovsky District (a branch of Nizhnovenergo).The rehabilitation of 110kV Akhlebinino substation(50 MVA) was finished.The completion of the rehabilitation programensured reliable electric power supply to the customersof the entire Ferzikovsky District of theKaluga Region and in the future will allow ensuringuninterruptible electric power supply to massresidential area in the village of Nikoskoye ofPeremyshlsky District of the Kaluga Region(a branch Kalugaenergo).The rehabilitation of 110 kV Dashki substation(126 MVA) was completed.The substation is the backbone supplying substationof the old part of Zheleznodorozhny Districtin Ryazan.Work aimed at rehabilitating the substationallowed ensuring reliable electric power supply tocustomers and satisfying the growing needs ofthe newly built facilities of JSC Ryazankhleb, JSCRyazanzernoprodukt in Ryazan (a branch ofRyazanenergo).The rehabilitation of 110 kV Polyany substation(80 MVA) was finalized. It is the backbone supplyingsubstation of Ryazansky District.Work aimed at rehabilitating the substationallowed raising the reliability of electric powersupply to the existing customers: JSC ROEI, ZAOZhilpromservis, PTs Polyany, OOO Orion, RVMK Okaand human settlements such as Polyany, Za -okskoye, Barskiye, Shumash, Dubrovichi, Korostovo,Agro-Pustyn (partly) and satisfying the growingneeds of the newly built facilities of RyazanskyDistrict of the Ryazan Region such as DNP Usadba,ZAO INTRER-GROUP (a branch of Ryazanenergo).JSC TyumenenergoWork related to the construction of 110 kV KNS-20substation (80 MVA) was completed.The substation commissioning ensured connectionto electric power supply of the crude oilextraction facilities of OOO RN-Yuganskneftegaz,which are category I customers, and ensured reliableenergy supply to the customers ofNefteyugansky District.New 110 kV Novo-Aganskaya substation (50 MVA)with delivering 110 kV Machtovaya — Novo-Aganskaya high-voltage line (100 km) was putinto operation.The commissioning of the new substation ensuredreliable energy supply to the customers of the villageof Novoagansk and created conditions fornetwork connection of new customers from theindustrial and public utilities areas of the village.186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!