12.07.2015 Views

Annual report 2010

Annual report 2010

Annual report 2010

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

19. Investments in the Distribution Grid SectorRehabilitation of Facilities for Development of theCity of Sochi as Mountain Ski Resort.”In <strong>2010</strong>, two facilities (Vishnyovaya and Rod -nikovaya substations) were put into operation.Eight facilities (points 117, 137, 154, 155, 156,157, 158 and 159) are undergoing the phase ofdesign and exploration and development ofdesign specifications and esimates (DSE).At one facility (point 152 “Urban ElectricityDistribution Grid”), construction is undergoingvarious phases ranging from the acceptance ofDSE by the customer to expert reviews, constructionand installation work.The DSE of four facilities were approved, agreementsfor construction and installation work(CIW) were executed and construction is underway(points 126, 127, 145 and 146).The Zakhody facility (110 kV), re-included in theconstruction program, to deliver capacity toAdlerskaya HPP before the existing line fromYuzhnaya substation to Adler substation, is undergoingthe project development phase.In <strong>2010</strong>, the construction of two facilities wasplanned and finalized:— Rehabilitation of 110 kV Rodnikovaya substation— June <strong>2010</strong>— Construction of 110 kV Vishnyovaya substation— December <strong>2010</strong>In 2011, it was planned to complete the constructionand commission 9 facilities:— Construction of 110 kV Bytkha substation —January 2011— Rehabilitation of 110 kV Vereshchaghinskayasubstation with overhangs — December2011— Construction of 110 kV high-voltage linebetween Sochinskaya TPP and Sochi substation— May 2011— Construction of 110 kV high-voltage linebetween Sochinskaya TPP and Khosta substation— May 2011— Rehabilitation of 110 kV high-voltage linebetween Psou substation, Yuzhnaya substationand Adler substation — December 2011— Construction and rehabilitation of phaseI facilities of the Urban ElectricityDistribution Grid:— Krasnaya Polyana Electricity Distribution GridArea — November 2011— Adler Electricity Distribution Grid Area —November 2011— Khosta Electricity Distribution Grid Area —October 2011— Central Electricity Distribution Grid Area(Khosta — Vereshchaghinskaya) — August2011 (point 152).In 2012, it is planned to complete and commission8 facilities:— Construction of the Production Base withinthe Krasnaya Polyana area of electric gridsand substations — December 2012— Rehabilitation of 110 kV high-voltage linebetween Sochinskaya TPP, Matsesta substation,Khosta substation, KrasnopolyanskayaHPP and Sochinskaya TPP — December 2012— Construction of 110 kV Bocharov Ruchei substation— August 2012— Rehabilitation of 110 kV high-voltage linebetween Sochinskaya TPP, Vereshchagh -inskaya substation and Dagomys substation— March 2012— Rehabilitation of 110 kV high-voltage linebetween Sochinskaya TPP, Sochi substation,Pasechnaya substation and Dagomys substation— December 2012— Rehabilitation of 110 kV high-voltage linebetween Psou substation, Adler substation,Kudepsta substation and Khosta substation— December 2012— Rehabilitation of 110 kV high-voltage linebetween Shepsi substation and Dagomyssubstation — December 2012— Construction and rehabilitation of phase Ifacilities of the Urban Electricity DistributionGrid, Central Electricity Distribution Grid Area(Vereshchaghinskaya — Bocharov Rucheisubstations) — March 2012In 2013, it is planned to complete and commissionphase II facilities of the Urban ElectricityDistribution Grid (in five areas). Commissioningtime limits pursuant to the resolution of theSupervisory Board of GK Olimpstroy, datedNovember 29, <strong>2010</strong>, will be specified in June 2011.189

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!