Sustainable Residential Development in Urban Areas
Sustainable Residential Development in Urban Areas
Sustainable Residential Development in Urban Areas
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
64<br />
Plann<strong>in</strong>g Guidel<strong>in</strong>es<br />
plan / local area plan. The design criteria set out <strong>in</strong> the design<br />
manual will also provide a useful framework <strong>in</strong> the assessment of<br />
applications, particularly <strong>in</strong> the light of significant plann<strong>in</strong>g issues<br />
identified at pre-application meet<strong>in</strong>gs.<br />
Tak<strong>in</strong>g <strong>in</strong> Charge<br />
8.8 Plann<strong>in</strong>g authority policy on tak<strong>in</strong>g <strong>in</strong> charge should comply with<br />
Circular Letter PD 1/08, Tak<strong>in</strong>g <strong>in</strong> Charge of <strong>Residential</strong><br />
<strong>Development</strong>s/ Management Arrangements, which is available from<br />
the Department’s website at www.environ.ie. Implementation by<br />
plann<strong>in</strong>g authorities of the requirements set out <strong>in</strong> the Circular falls<br />
with<strong>in</strong> the statutory scope of these Guidel<strong>in</strong>es and is therefore<br />
covered by the provisions of Section 28 of the Plann<strong>in</strong>g and<br />
<strong>Development</strong> Acts.<br />
Circular Letter PD 1/08 requires each plann<strong>in</strong>g authority to develop<br />
or update, as appropriate, and implement a policy on tak<strong>in</strong>g <strong>in</strong> charge<br />
<strong>in</strong> accordance with the policy guidance, the ma<strong>in</strong> pr<strong>in</strong>ciples of which<br />
are as follows:<br />
• Certa<strong>in</strong> core facilities and <strong>in</strong>frastructure should be taken <strong>in</strong><br />
charge on request - public roads and footpaths, unallocated<br />
surface park<strong>in</strong>g areas, public light<strong>in</strong>g, public water supply, foul<br />
and storm water dra<strong>in</strong>age and public open spaces;<br />
• The matter of tak<strong>in</strong>g <strong>in</strong> charge should be addressed at preplann<strong>in</strong>g<br />
application stage and <strong>in</strong> the plann<strong>in</strong>g application the<br />
developer should be required clearly to identify the area to be<br />
taken <strong>in</strong> charge <strong>in</strong> due course;<br />
• Plann<strong>in</strong>g authorities should take all necessary measures to<br />
ensure proper completion of the development <strong>in</strong> particular<br />
through secur<strong>in</strong>g adequate bonds, ongo<strong>in</strong>g <strong>in</strong>spection of<br />
construction and the tak<strong>in</strong>g of enforcement action when<br />
necessary;<br />
• The procedures for tak<strong>in</strong>g <strong>in</strong> charge should beg<strong>in</strong> promptly on<br />
foot of a request by the majority of the residents <strong>in</strong> the<br />
development or by the developer, as appropriate. Protocols,<br />
<strong>in</strong>clud<strong>in</strong>g time frames, must be set out by plann<strong>in</strong>g authorities<br />
to respond to requests for tak<strong>in</strong>g <strong>in</strong> charge; and