13.07.2015 Views

VOLUME 1 HUMAN SETTLEMENT PLANNING AND ... - CSIR

VOLUME 1 HUMAN SETTLEMENT PLANNING AND ... - CSIR

VOLUME 1 HUMAN SETTLEMENT PLANNING AND ... - CSIR

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GUIDELINES FOR <strong>HUMAN</strong> <strong>SETTLEMENT</strong> <strong>PLANNING</strong> <strong>AND</strong> DESIGNBIBLIOGRAPHYAfrican National Congress (ANC) (1994). TheReconstruction and Development Programme.Umanyano, Johannesburg.Bartone, C et al (1994). Toward environmentalstrategies for cities. Urban Management ProgrammeReport No. 18. UNCHS (Habitat) / The World Bank /UNDP. Washington.Behrens, R and Watson, V (1996). Making urbanplaces: principles and guidelines for layout planning.Urban Problems Research Unit, University of CapeTown.Cairncross, S and Feachem, R G (1993). Environmentalhealth engineering in the tropics. (2nd ed.) JohnWiley, Chichester.City of Cape Town (1996). Nyanga Station precinctdevelopment framework. Report by City Planner’sDepartment to Urban Planning Committee. 22November.City of Cape Town (1997). Nyanga Station precinctdevelopment: Urban, landscaping and architecturaldesign brief. Draft: City Planner’s Department.<strong>CSIR</strong> (1994). Guidelines for the provision ofengineering services and amenities in residentialtownship development. Revised edition, NationalHousing Board. Pretoria.Development Bank of Southern Africa (1993a). Socioeconomicenhancement of development projects.Construction and development series: No. 1. DBSA.Midrand.Development Bank of Southern Africa (1993b).Interim guidelines for labour-based constructionprojects. Construction and development series: No. 2.DBSA. Midrand.Feachem, R G, Bradley, D J, Garelick, H and Mara, D D(1983). Sanitation and disease: Health aspects ofexcreta and wastewater management. Published forthe World Bank. John Wiley. Washington DC.Genthe, B and Seager, J (1997). The effect of watersupply, handling and usage on water quality inrelation to health indices in developing communities.Water Research Commission Report Nr. 562/1/96.Water Commission. Pretoria.Greater Johannesburg Transitional MetropolitanCouncil (1997). Greater Johannesburg economicdevelopment study tour of Cape Town, Port Elizabethand Durban. GJTMC. Johannesburg.Greater Johannesburg Transitional MetropolitanCouncil, Southern MLC (1997a). Development andmanagement of street trading markets: A proceduralguide for the Southern Metropolitan Local Council.Southern MLC. Johannesburg.Greater Johannesburg Transitional MetropolitanCouncil, Southern MLC (1997b). Informal tradingprojects within the outlying areas and the informalsettlements 97/98. Local Economic DevelopmentDepartment. Southern MLC. Johannesburg.Huchzermeyer, M (1994). Public obligation versusindividual liberty: Considerations in the provision ofliving environments for the lowest income sector onwell-located land in Cape Town, with reference to theWingfield site. Project report for Master’s Degree inCity Planning and Urban Development, University ofCape Town, October.Huchzermeyer, M (1996). Nyanga: Interviewing ofresidents and roleplayers. Project report for ODA.Draft, May.Kalbermatten, J M, Julius, D S and Gunnerson, C G(1980a). Appropriate technology for water supply andsanitation. Vol 1: Technical and economic options.World Bank. Washington DC.Keep South Africa clean organisation (1997). One mancontract.Kerr, C (Ed) (1989). Community water development.Intermediate Technology Publications. London.Kerr, C (Ed) (1990). Community health and sanitation.Intermediate Technology Publications. London.Mayet, M A G (1994). Domestic waste generation inthe urban core of the DFR. MSc dissertation, Universityof Natal.Milne, C (1994). Guidelines for emerging contractordevelopment. Construction and development series:No. 5. DBSA. Midrand.Ninham Shand (1997): Design of water delivery toreduce health risks. Report for NaSCO of DWAF. Draft.October 1997.Ninham Shand (1998). Appropriate guidelines on theplanning and design of collective public utility systems,as a planned element of settlement systems.Unpublished report prepared for the <strong>CSIR</strong>, Pretoria.Okun, D A and Ernst, W R (1987). Community pipedwater supply systems in developing countries: Aplanning manual. World Bank Technical Paper No. 60.World Bank, Washington DC.16Chapter 5.7Public utilities

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!