7.4.2 Assembling the distributor pipeThe high-pressure water coming from pump station first enters amanifold and is routed from there to the nozzle.The manifold is mounted according to the nozzle assemblysheet (project specific) produced by <strong>HygroMatik</strong> on the vortexwall.Each nozzle in the vortex wall is connected to the manifold witha hose. Each nozzle must be higher than the corresponding porton the manifold - the water hose must have a constant slopeInstallation:2345212ABC» A manifold is mounted on the inlet side to at least twovortex modules.» Determine distributor pipe position (1) on vortex wall inaccordance with nozzle data sheet.» Place retaining clips (3) on the appropriate position onVortex Modules.» Put screw (2) through by retaining clip Vortex Module.» Tighten nut (4) with washer (5) on the rear of the VortexModule where the screw stands proud.» Repeat this process for all the holding clamps.» Press manifold (1) into the holding clamps (see figureC) and check for tightness.Page 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!