13.07.2015 Views

LPS Instruction Manual - HygroMatik

LPS Instruction Manual - HygroMatik

LPS Instruction Manual - HygroMatik

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12. CommissioningNote: The <strong>LPS</strong> nozzle system may only be operated by qualifiedpersonnel.Turning the <strong>LPS</strong> nozzle system offNote: Before the <strong>LPS</strong> nozzle system is put into operation, itmust be clear how to switch the system off.» Switch off Nozzle system using control switch (Pos.0).» Shut off water supply shut-off valve.Check all cable connections» Check all cable connections for tightness.Activating the <strong>LPS</strong> nozzle system» Operate main switch.» Set manometer to „open“» Open up water shut-off valve» Switch on unit using control switch (Pos.I).» Set commissioning control to permanent demandsteam production.The following functions begin:A self-test.When humidity is demanded, the pump vane is operated anddirects the water at a pressure of up to 16 bar to the nozzle.The water is atomized at the nozzle. All nozzles should not dripand show an even spray pattern.Further tests: All electrically-powered functions must function.» Observe <strong>LPS</strong> nozzle system and let it run for 15-30minutes. The air conditioning duct fan should be in operationso that the moisture produced can be blownaway. Should any leakages be evident then turn the<strong>LPS</strong> nozzle system off.» Eliminate the leaks:Attention, voltage! Please observe all safety instructions whileworking on live components.Page 48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!