Table 2.3Pile Driving Details<strong>Project</strong> Design Basis of 2002 Approved 2002 CSRWellhead PlatformProductionPlatformUtilities andQuarters PlatformNo.PilesSize [mm (in)]4 2100 (84) 61842100(84)2100(84)SSIV Skid 1 4 610-910 (24-36) 8 - 12Revised <strong>Project</strong> BasisNo.PilesSize [mm (in)]WellheadProtection (x9) 36 24 - 36 8 - 12Penetration[m] Hammer Size Max. Energy ]N.m (ft. lbs)] Actual Driving Duration/PileMenck MHU-1700(or equivalents)68 Same as WHP65 Same as WHPIHC S-90(or equivalents)1,699,000(1,253,000)1,699,000(1,253,000)1,699,000(1,253,000)89,000(66,000)ActualDrivingDuration4 to 6 hr 16hr - 24hr4 to 6 hr 32hr - 48hr4 to 6 hr 16hr - 24hr0.5hr - 1hrEstimated Total Duration 2 (Menck MHU-1700)Estimated Total Duration 3 (IHC S-90)Penetration[m] Hammer Size Max. Energy [N.m (ft. lbs)] Actual Driving Duration/pileIHC S-90(or equivalents)Hot Tap 4 24 - 36 8 - 12 Same as WellheadTie-in 4 24 - 36 8 - 12 Same as WellheadSSIV Skid 1 4 24 - 36 8 - 12 Same as Wellhead2hr - 4hr64hr - 96hr2.7 d – 4 d2hr - 4hrActualDrivingDuration89,000(66,000) 0.5hr - 1hr 18hr - 36hr89,000(66,000) 0.5hr - 1hr 2hr - 4hr89,000(66,000) 0.5hr - 1hr 2hr - 4hr89,000(66,000) 0.5hr - 1hr 2hr - 4hr1 May not be required since in Platform/MOPU Safety Zone2 Approximately 40 to 45% of the duration is under water hammer activities3 All the duration is underwater hammer activitiesEstimated Total Duration 3 (IHC S-90)24hr - 48hr1d - 2d<strong>Deep</strong> <strong>Panuke</strong> Volume 4 (Environmental Assessment Report)• November 2006 2-23