13.07.2015 Views

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.9.5 Subsea Protection StructuresThe production and acid gas injection well trees and the hot tap (SOEP Subsea Option) will be protectedby dedicated protection structures. These shall be separately deployed structures and designed towithstand impacts from conventional mobile fishing gear. They will also serve as dropped objectsprotection and shall be designed to allow adequate access to the wells for all planned diver and ROVintervention tasks. The wells and hot tap locations will be charted.2.9.6 <strong>Project</strong> Safety ZonesRefer to Section 2.4.4 for information.2.10 <strong>Project</strong> Alternatives2.10.1 Alternatives to the <strong>Project</strong>The Alternatives to the <strong>Project</strong> as presented in the approved 2002 CSR have not changed. Accordingly,alternatives to the <strong>Project</strong> are not addressed in this section as there is no need to re-assess.2.10.2 Alternatives Means of Carrying Out the <strong>Project</strong>Since the approval of the CSR in 2002, EnCana has investigated options and alternatives that are moreeconomically feasible based on resource estimates which are lower than those predicted in 2002. The<strong>Project</strong>, as conceived at present, shares many similarities with the original <strong>Project</strong> concept; however,some aspects have changed.This section describes the <strong>Project</strong> design basis as originally conceived in 2002 and discusses thealternatives that were studied leading to the final concept selection.The 2002 <strong>Project</strong> basis was designed to produce a sour gas reservoir via an offshore processing conceptand transport sales quality gas to market via a 610 mm [24 inch] 176 km pipeline with an onshore tie-into the M&NP pipeline near Goldboro, NS. The producing reservoir was located in a relatively smallareal plot enabling production to be sourced from a cluster of directionally-drilled wells from a centralwellhead platform. Offshore processing was to be performed on a second bridge-linked productionplatform. The production platform contained the main process-related utility systems. The mainelements that formed the process were as follows:· H 2 S removal;· condensate recovery and processing as the primary source for fuel on the platform;· gas dehydration;<strong>Deep</strong> <strong>Panuke</strong> Volume 4 (Environmental Assessment Report)· November 2006 2-60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!