Deep Panuke Project Description - Encana
Deep Panuke Project Description - Encana
Deep Panuke Project Description - Encana
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 2.8 Routine <strong>Project</strong> Emissions/EffluentsType Emission/Effluent Estimated Quantity Characteristics Disposal StandardConstruction/Installation/DrillingAtmosphericEmissionsGenerator, engine andutilities exhaustsTemporary, minor CO 2 , SO 2 , NO x , TSP Atmospheric emissions will comply with the Air Quality Regulations(Nova Scotia Environment Act) and Ambient Air Quality ObjectivesDrill WasteDischargesLiquid Effluentfor OceanDischargeFlaring during wellclean-up and completionWBMWBM associatedcuttingsCompletion brineSanitary and food wasteExpected ~1/2 day perproduction (new and re-entry)well, unless otherwise requiredby operating requirements.Bulk surface release ofapproximately 700 m 3 of WBMfor production well; 600 m 3 forinjection well. WBM oncuttings is expected to be 244m 3 for each production welland 233 m 3 for injection well.Approximately 558 m 3 ofWBM associated cuttingsdischarged for each newproduction well to be drilled;487 m 3 for injection well.Approximately 1000 m 3 ofcompletion brine will bedischarged at the surface foreach new production well to bedrilled; 300 m 3 for each wellre-entry and the injection wellcompletion.Maximum capacity of thefacility during operation isapproximately 68 persons withan estimated volume of 20 Lper person per day; amountswill increase duringconstruction phase withincreased presence of vesselsand crews.Possible NOx, CH 4 , TSP,SO 2 , CO 2 , TPH, H 2 STypical constituentsinclude: barite, bentonite,KCl, polymers, NaHCO 3 ,lime, caustic soda, salt, andwaterRock cuttings coated withWBMWater-based brine, possiblyviscosifiersMacerated food, grey waterand sanitary waste(CEPA).Compliance with CNSOPB Production and Conservation Regulations(Section 32), Air Quality Regulations (Nova Scotia Environment Act)and Ambient Air Quality Objectives (CEPA).WBM will be disposed overboard. 1WBM associated cuttings will be disposed overboard. 1Completion fluid will be discharged overboard as permitted by theCNSOPB. 1Sanitary and food waste will be macerated to a particle size of 6 mm orless prior to ocean discharge. 1<strong>Deep</strong> <strong>Panuke</strong> Volume 4 (Environmental Assessment Report)• November 2006 2-47