13.07.2015 Views

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.7.4 Drill Waste Discharges2.7.4.1 Use of Drill MudsAll drilling fluids (mud) go through a cyclic process during the drilling of a well. Prior to drilling aspecific hole section, the required type of mud must be prepared. It is either prepared onshore andbrought to the rig, or the required base products are brought to the rig and it is prepared onboard. Oncethe mud is ready for use, the drilling may begin for that hole section. The following describes the simplecycle that all drilling fluids follow:1. The mud is pumped down the drillpipe to the bit on the bottom.2. The mud comes out the bit and picks up the cuttings that the bit has produced and carries thesecuttings back to the rig on the outside of the drillpipe.3. Once back on the drilling rig, the cuttings (solid materials) are separated from the mud using solidscontrol equipment. Linear vibrating shakers plus periodic use of centrifuges are the maincomponents of the solids control equipment used to separate solids (cuttings from the wellbore) fromthe drilling mud.4. The clean mud returns to the original tanks for any minor modifications (additional products) beforestarting the cycle again.5. The cycle continues until the hole section reaches final depth.Once the final depth of the hole section is achieved, the mud is cleaned for re-use on the next holesection or it is removed from the rig to allow for the next drilling fluid for the subsequent operation.Bulk mud releases will be minimized by re-using mud on the next hole section or well if possible. WBMwill be released overboard during bulk releases.Typically, a conventional production well would be installed as follows:1. Drill and case the conductor hole, then prepare WBM and change drilling tools.2. Drill and case the surface hole, then change the mud system and drilling tools.3. Drill and case the intermediate hole section, then change the drilling tools.4. Drill and case the main hole section re-using the mud system from the intermediate hole section.5. Circulate the well to clean out drilling solids, displace drilling fluid from the wellbore to completionfluid and install the completion tubing / equipment.6. Provide underbalance and allow the well to flow to surface removing all completion fluids untilburnable gas at surface prior to handover to production.7. Secure the well and move the rig to the next well location and repeat the process.<strong>Deep</strong> <strong>Panuke</strong> Volume 4 (Environmental Assessment Report)• November 2006 2-53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!