13.07.2015 Views

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

Deep Panuke Project Description - Encana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.7.6 Naturally Occurring Radioactive Material (NORM)The description of NORM and appropriate management procedures presented in the approved 2002CSR remain valid. Refer to Section 2.7.6 of the approved 2002 CSR.2.7.7 Non-Hazardous Solid WastesThe discussion of non-hazardous solid wastes presented in the approved 2002 CSR remains valid. Referto Section 2.7.7 of the approved 2002 CSR.2.8 Hazardous Materials and WasteThe discussion of management of hazardous materials and waste presented in the approved 2002 CSRremains valid. This includes, but is not limited to, commitments by EnCana to adhere to all applicablefederal and provincial codes and regulations for the handling and transport materials. Refer to Section2.8 of the approved 2002 CSR.2.9 Environmental and Safety Protection Systems2.9.1 Equipment Inspection and MaintenanceAll <strong>Project</strong> equipment will meet the requirements of industry standards, and be certified as being safeand fit for its intended use. Purchase orders for such equipment will be suitably monitored during themanufacturing and testing processes for strict compliance to these standards and to all applicableregulations as set out by the CNSOPB. Where required, the Certifying Authority (CA) may provideadditional surveillance. Once installed, equipment will be operated and maintained in accordance withdocumented processes and procedures. EnCana will submit inspection and monitoring programs, amaintenance program and a weight control program to the CA for approval. These regular inspectionand maintenance programs will ensure continued equipment reliability and integrity. Necessary criticalspares will be maintained should equipment change-out be required. Subsea inspection programs allowfor regular monitoring of critical subsea components such as pipelines.As part of the maintenance of the Certificate of Fitness for the MOPU, the CA is required to conductinspections and surveys during the operation phase of the <strong>Project</strong> (Annual Surveys). These surveys willverify that installations is being operated in accordance with the approved programs noted above andprovide further assurance that safety and protection of the environment are being upheld.<strong>Deep</strong> <strong>Panuke</strong> Volume 4 (Environmental Assessment Report)• November 2006 2-57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!