Series 5600 Outside Glazed <strong>Installation</strong> <strong>Instructions</strong>Section III: Typical Anchorage MethodsSTEP #7 INSTALL FRAME COMPONENTSSet the last frame in the run into the opening mating the filler with theintermediate vertical, and rotate the frame around to the perimeter anchorchannel until the filler and vertical snap together. Using dead load shims beneatheach vertical mullion to level the frame, make all necessary adjustments toproperly locate the frame to established benchmarks, and apply the temporaryretainers.Apply dead loadshims belowverticals.Apply temporaryretainers.EFCO CORPORATION 6/2012 PART NO. YS56 Page 13 of 54