Series 5600 Outside Glazed <strong>Installation</strong> <strong>Instructions</strong>Section III: Typical Anchorage MethodsSTEP #10 INSTALL FRAME COMPONENTS – Bolted Dead Load AnchorsFor installations with multi-spans, follow applicable notes from step 8.When the frame is properly aligned and is level and plumb, match drill the slabthrough anchor, and install anchor bolts securing the anchor to the buildingstructure.Match drill the mullion through a set of holes in the anchor. NOTE: The holesmust be a minimum of 1” from the back of the mullion in order to clear any steelreinforcement located inside the system, as may be required on a job specificbasis.Use a bolt with a flat washer at the head end and a flat washer and a spring lockwasher next to the nut as shown. Shim at each bolt as shown.Refer to approved shop drawings for anchor locations, bolt sizes, embedment, aswell as anchor dimensions.NOTE: For special instructions regarding wind load anchors see page 19, step 11.BuildingstructureFrame unitsHigh impactpolystyrenehorseshoe shimsat each boltSteel anchorper approvedshop drawingsFlat and springwashers andnutsBolts with flatwashersTemporary alignment screw(#12 X 1” Tek screw)Anchor boltsas requiredEFCO CORPORATION 6/2012 PART NO. YS56 Page 17 of 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!