S5600 Installation Instructions - Efco
S5600 Installation Instructions - Efco
S5600 Installation Instructions - Efco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Series 5600 Outside Glazed <strong>Installation</strong> <strong>Instructions</strong>Section V: Alternate Anchorage Method (PunchedOpenings)STEP #4 Side stack Preassembled FramesFrames can be partially assembled off-site and moved to the jobsite. Then, groups offrames may be snapped together, allowing them to be set into the opening at onetime. The size of the group of frames to be installed is limited by the field’s handlingcapacity due to the weight and size of the assemblies.Assembled framesSee step 6, page 12for special sealantnote at horizontals.EFCO CORPORATION 6/2012 PART NO. YS56 Page 24 of 54