13.07.2015 Views

S5600 Installation Instructions - Efco

S5600 Installation Instructions - Efco

S5600 Installation Instructions - Efco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Series 5600 Outside Glazed <strong>Installation</strong> <strong>Instructions</strong>Section III: Typical Anchorage MethodsSTEP #1 INSTALL FRAME COMPONENTSInstall perimeter channel anchors to the jamb conditions with appropriate shims andanchor bolts. The channel must be set to proper benchmarks for the final position of thewall. The top and bottom of the channels should align with the top of the head andbottom of the sill frame dimensions. Refer to the approved shop drawings for jobspecific conditions, anchor bolt sizes and locations. Install assemblies according toapproved shop drawings.Shim as requiredPerimeter channel anchorAnchor bolts as requiredJamb ConditionEFCO CORPORATION 6/2012 PART NO. YS56 Page 7 of 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!