State Infrastructure Plan
sip-part-b
sip-part-b
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Transport<br />
Project<br />
Total<br />
estimated<br />
cost<br />
($M)<br />
Contributions<br />
Fed QG LG Priv<br />
Expenditure<br />
to June 2015<br />
($M)<br />
2015–16 2016–17<br />
Funding ($M)<br />
Indicative<br />
2017–18<br />
to 2018–19<br />
Beyond<br />
Rail<br />
Caboolture rail line–<br />
167.572 ● 76.873 72.559 18.140<br />
Lawnton and Petrie third<br />
track<br />
Gold Coast Light Rail<br />
TBC ● ● ● ● Currently subject to commercial negotiation<br />
Stage 2<br />
Gold Coast rail line–<br />
163.257 ● 0.880 63.373 54.400 44.604<br />
Coomera to Helensvale<br />
duplication<br />
Citytrain Rollingstock<br />
393.873 ● 135.520 53.671 23.276 72.687 108.718<br />
Overhauls<br />
South East Queensland– 152.724 ● 31.949 31.527 54.215 35.033<br />
Bridge Replacement and<br />
Renewal<br />
South East Queensland– 429.026 ● 92.665 82.840 164.472 89.050<br />
Network Management and<br />
Enhancement<br />
South East Queensland– 134.816 ● 26.080 37.531 54.347 16.858<br />
Other Network Renewal<br />
South East Queensland– 249.312 ● 42.585 60.639 102.316 43.773<br />
Passenger Safety and<br />
Accessibility<br />
South East Queensland– 78.308 ● 12.937 13.827 33.283 18.261<br />
Track Replacement and<br />
Renewal<br />
South East Queensland– 97.359 ● 57.359 30.000 10.000<br />
Concrete Resleepering<br />
South East Queensland– 96.512 ● 15.535 16.127 43.236 21.615<br />
Turnout Replacement and<br />
Renewal<br />
Public transport<br />
Park ’n’ Ride construction 21.280 ● 0.280 3.000 6.000 12.000<br />
and upgrades<br />
Active Transport<br />
Veloway 1–Stage D<br />
25.222 ● 0.360 5.900 9.701 9.261<br />
(O'Keefe Street–Lewisham<br />
Street)<br />
North Brisbane Bikeway 24.789 ● 6.847 2.942 5.000 10.000<br />
Stages 1, 2 and 3<br />
Regional Queensland<br />
Toowoomba Second Range 1606.250 ● 16.045 172.055 375.000 1043.150<br />
Crossing 3<br />
Bruce Highway<br />
Cooroy to Curra Section C<br />
upgrade<br />
Cooroy to Curra Section A<br />
upgrade<br />
Cooroy to Curra Section D<br />
upgrade<br />
692.147 ● ● 48.065 41.382 166.200 436.500<br />
490.000 ● ● 189.453 113.065 187.482<br />
114.203 ● ● 49.763 7.405 7.035 50.000<br />
<strong>State</strong> <strong>Infrastructure</strong> <strong>Plan</strong> Part B: Program<br />
39