State Infrastructure Plan
sip-part-b
sip-part-b
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Energy<br />
Project<br />
Total<br />
estimated<br />
cost<br />
($M)<br />
Contributions<br />
Fed QG LG Priv<br />
Expenditure<br />
to June 2015<br />
($M)<br />
2015–16 2016–17<br />
Funding ($M)<br />
Indicative<br />
2017–18<br />
to 2018–19<br />
Beyond<br />
Regional Queensland<br />
0.374<br />
Capital works to connect 1187.546 ● 213.284 243.566 487.131 243.566<br />
new customers<br />
Works on unregulated<br />
34.073 ● 8.742 6.333 12.665 6.333<br />
networks<br />
Bunbaberg Port Gas<br />
18.000 ● 9.000 8.626<br />
Pipeline 2<br />
Palm Island Renewable<br />
17.900 ● 12.577 5.323<br />
Ready Power Station<br />
Coconut Island 35kV Solar 0.062 ● 0.062<br />
installation<br />
Camooweal Solar Project 0.307 ● 0.307<br />
Various smaller projects<br />
throughout Queensland<br />
55.969 ● 26.670 24.761 3.157 1.380<br />
Stanwell Power Station<br />
works<br />
Tarong and Tarong North<br />
Power Station works<br />
Mica Creek Power Station<br />
overhauls<br />
Meandu Mine infrastructure<br />
maintenance and<br />
replacement<br />
Kogan Creek Power Station<br />
and coal mine works<br />
Callide Power Station<br />
works<br />
205.600 ● 18.200 38.900 48.000 92.100 8.400<br />
124.500 ● 39.100 17.600 55.400 12.400<br />
11.200 ● 7.200 4.000<br />
129.400 ● 20.300 42.400 48.200 18.500<br />
158.143 ● 17.080 55.056 16.323 58.678 11.006<br />
279.791 ● 15.993 36.450 31.237 168.135 27.976<br />
Notes:<br />
1<br />
This program incorporates Powerlink minor projects across Queensland.<br />
2<br />
The private sector will build, own and operate the pipeline.<br />
The Queensland Government has implemented an Accelerated Works Program for regional Queensland. Some of the announced projects are<br />
individually highlighted in this document, while others may be embedded in a larger program of work.<br />
<strong>State</strong> <strong>Infrastructure</strong> <strong>Plan</strong> Part B: Program<br />
53