Energy<br />
1–4 year program<br />
Project<br />
Total<br />
estimated<br />
cost<br />
($M)<br />
Contributions<br />
Fed QG LG Priv<br />
Expenditure<br />
to June 2015<br />
($M)<br />
2015–16 2016–17<br />
Funding ($M)<br />
Indicative<br />
2017–18<br />
to 2018–19<br />
Beyond<br />
South East Queensland<br />
Rocklea Secondary<br />
17.400 ● 2.000 3.600 8.300 3.500<br />
Systems replacement<br />
SunCoast Powerline<br />
80.314 ● 11.569 2.072 4.844 52.789 9.040<br />
project–Palmwoods to<br />
Maroochydore<br />
Kingston to Jimboomba<br />
57.912 ● 26.696 19.186 12.030<br />
Network upgrade<br />
Jimboomba to Jimboomba 9.619 ● 2.343 7.277<br />
West–new 33kV powerlines<br />
Springfield Central<br />
41.829 ● 40.837 0.967 0.025<br />
Substation–33/11kV<br />
Substation upgrades at 202.520 ● 137.940 22.457 18.544 19.097 4.482<br />
various SEQ locations<br />
Nudgee to Hendra cable<br />
14.675 ● 10.618 4.057<br />
upgrade<br />
Consolidate Brisbane<br />
11.400 ● 9.400 2.000<br />
Enterprise Program of Work<br />
Wivenhoe Hydro Power<br />
37.943 ● 5.756 8.219 9.025 10.347 4.596<br />
Station works<br />
Powerlink augmentation 1124.197 ● 857.654 266.543<br />
and asset replacement 1<br />
Energex augmentation and<br />
asset replacement<br />
434.320 ● 434.320<br />
Regional Queensland<br />
Mackay Substation rebuild<br />
and Nebo Primary <strong>Plan</strong>t<br />
replacement<br />
Blackall iPASS Secondary<br />
Systems replacement<br />
Stanwell and Ross<br />
Secondary Systems<br />
replacement<br />
Bulli Creek and Braemar<br />
iPASS Secondary Systems<br />
replacement<br />
Moura and Callide A<br />
Switchyard replacement<br />
Gladstone South Zone<br />
Substation upgrade<br />
East Warwick Zone<br />
Substation upgrade<br />
Central Toowoomba Zone<br />
Substation upgrade<br />
Grid Utility Support System<br />
(GUSS)<br />
General augmentation and<br />
asset replacement<br />
General augmentation<br />
and asset replacement at<br />
isolated power stations<br />
54.800 ● 9.700 8.100 25.600 11.400<br />
26.200 ● 17.500 6.200 1.500 1.000<br />
43.200 ● 25.400 4.700 8.400 4.700<br />
51.100 ● 43.000 4.100 4.000<br />
59.300 ● 10.500 27.100 21.700<br />
19.100 ● 2.100 16.000 1.000<br />
33.390 ● 23.752 9.602 0.036<br />
84.487 ● 66.769 17.718<br />
12.245 ● 5.106 7.140<br />
1972.957 ● 339.267 408.422 816.845 408.422<br />
98.012 ● 13.199 21.203 42.407 21.203<br />