State Infrastructure Plan
sip-part-b
sip-part-b
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Water<br />
Selected projects 1–4 year program<br />
# PROJECT # PROJECT<br />
1 Mt Crosby Water Treatment <strong>Plan</strong>t upgrade 11 Mount Isa Water Board other projects<br />
2 North Pine Water Treatment <strong>Plan</strong>t upgrade 12 Moondarra pipeline system upgrade<br />
3 Landers Shute Water Treatment <strong>Plan</strong>t upgrade 13 Gladstone to Fitzroy Pipeline Project<br />
4 Lowood Water Treatment <strong>Plan</strong>t upgrade 14 Lower Fitzroy <strong>Infrastructure</strong><br />
5 Lake Macdonald Dam upgrade 15 Awoonga Dam Pump Station upgrade<br />
6 Kingaroy Wastewater Treatment <strong>Plan</strong>t upgrade 16 Gladstone North Industrial Area water supply upgrade<br />
7 Paradise Dam safety upgrade 17 Gladstone Water Treatment <strong>Plan</strong> upgrade<br />
8 Burdekin Dam safety upgrade 18 Gladstone Water Treatment <strong>Plan</strong>t to South Gladstone<br />
Reservoir Pipeline replacement<br />
9 Teemburra Dam safety upgrade 19 Cairns/Mount Peter sewer upgrade<br />
10 Lake Julius power reliability improvements 20 Townsville Sewage Treatment <strong>Plan</strong>t upgrade<br />
Weipa<br />
6<br />
Wide Bay<br />
5<br />
Sunshine<br />
Coast<br />
3 Maroochydore<br />
Cairns<br />
19<br />
Toowoomba<br />
Greater<br />
Brisbane<br />
Brisbane<br />
4<br />
1<br />
2<br />
Cairns<br />
Townsville<br />
20<br />
Darling<br />
Downs/<br />
Maranoa<br />
Gold<br />
Coast<br />
Southport<br />
Mount Isa<br />
10,11,12<br />
Townsville<br />
8<br />
9<br />
Mackay<br />
Mackay<br />
Remote<br />
Queensland<br />
Longreach<br />
Rockhampton<br />
14 13<br />
16,17,18 Gladstone<br />
15<br />
Fitzroy<br />
Bundaberg<br />
Wide<br />
Bay 7<br />
see inset<br />
Maroochydore<br />
Key<br />
N<br />
Darling Downs/<br />
Maranoa<br />
Toowoomba<br />
Brisbane<br />
Southport<br />
Project<br />
Population centre<br />
62 <strong>State</strong> <strong>Infrastructure</strong> <strong>Plan</strong> Part B: Program