State Infrastructure Plan
sip-part-b
sip-part-b
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Water<br />
Project<br />
Total<br />
estimated<br />
cost<br />
($M)<br />
Contributions<br />
Fed QG LG Priv<br />
Expenditure<br />
to June 2015<br />
($M)<br />
2015–16 2016–17<br />
Funding ($M)<br />
Indicative<br />
2017–18<br />
to 2018–19<br />
Beyond<br />
Regional Queensland<br />
● 0.500<br />
●<br />
● 5.834 1.425<br />
Gladstone North Industrial 6.671 ● 6.671<br />
Area water supply upgrade<br />
Awoonga Dam Pump<br />
5.720 ● 1.338 4.382<br />
Station upgrade<br />
Gladstone Water Treatment 5.053 ● 0.240 0.925 3.888<br />
<strong>Plan</strong>t upgrade<br />
Gladstone Water Treatment 3.480 ● 0.582 2.898<br />
<strong>Plan</strong>t to South Gladstone<br />
Reservoir Pipeline<br />
replacement<br />
Gladstone Area Water<br />
3.249 ● 0.275 0.863 1.434 0.677<br />
Board capital works–water<br />
treatment plants<br />
Gladstone Area Water<br />
2.078 ● 2.078<br />
Board Boat Creek Reservoir<br />
expansion<br />
Gladstone Area Water<br />
39.470 ● 0.237 14.719 8.421 12.149 3.944<br />
Board other projects<br />
Cairns/Mt Peter sewer<br />
11.200 ● ● 6.700 4.500<br />
upgrade<br />
Kingaroy Wastewater<br />
26.318 ● 5.240 4.260<br />
Treatment <strong>Plan</strong>t upgrade 1<br />
Townsville Sewage<br />
51.000 ● ● 5.000 15.000<br />
Treatment <strong>Plan</strong>t upgrade 1<br />
Rubyanna Wastewater<br />
62.050 ● ● 2.500 2.500<br />
Stage 1 1<br />
Treatment <strong>Plan</strong>t (RWWTP)–<br />
Port Douglas Water Supply 13.491 ● ● 5.000<br />
Reservoir 1<br />
Mareeba Wastewater<br />
15.000 ● ● 5.000<br />
treatment plant works 1<br />
Treatment <strong>Plan</strong>t upgrade–<br />
Chinchilla Potable Water 21.500 ● ● 5.000<br />
Stage 1 1<br />
Treatment <strong>Plan</strong>t upgrade<br />
Various water<br />
79.014 ● ● 34.031<br />
infrastructure projects 1<br />
Notes:<br />
1<br />
The sum of the cashflows does not equal Total Estimated Cost because cashflows are Queensland Government cashflows only.<br />
The Queensland Government has implemented an Accelerated Works Program for regional Queensland. Some of the announced projects<br />
are individually highlighted in this document, while others may be embedded in a larger program of work.<br />
<strong>State</strong> <strong>Infrastructure</strong> <strong>Plan</strong> Part B: Program<br />