State Infrastructure Plan
sip-part-b
sip-part-b
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Transport<br />
Project<br />
Total<br />
estimated<br />
cost<br />
($M)<br />
Contributions<br />
Fed QG LG Priv<br />
Expenditure<br />
to June 2015<br />
($M)<br />
2015–16 2016–17<br />
Funding ($M)<br />
Indicative<br />
2017–18<br />
to 2018–19<br />
Beyond<br />
Bruce Highway<br />
Bowen to Ayr bridge and<br />
culvert upgrades<br />
Upgrade Bruce Highway<br />
at Central Queensland<br />
University<br />
Peak Downs Highway<br />
Eton Range Realignment<br />
Project<br />
Peak Downs Highway<br />
bridge replacements<br />
between Nebo and Mackay<br />
(as part of the Bridges<br />
Renewal Program)<br />
43.750 ● ● 30.263 4.355 9.132<br />
8.500 ● 4.000 4.500<br />
189.200 ● ● 10.530 11.200 81.660 85.810<br />
70.000 ● ● 12.916 40.000 17.084<br />
●<br />
Other road and transport projects<br />
Warrego Highway Upgrade 635.000 ● ● 22.944 107.811 70.875 433.369<br />
Program<br />
North West District highway 25.000 ● ● 12.300 12.700<br />
upgrade (as part of the<br />
National Highway Upgrade<br />
Program)<br />
New England Highway<br />
11.625 ● ● 0.325 5.000 6.300<br />
upgrades (as part of the<br />
National Highway Upgrade<br />
Program)<br />
Landsborough Highway<br />
12.500 ● ● 0.010 0.865 5.000 6.625<br />
(Blackall-Barcaldine)<br />
upgrades (as part of the<br />
National Highway Upgrade<br />
Program)<br />
Yeppoon Western Bypass 30.000 ● 9.000 9.000 8.000 4.000<br />
Stage 2 5<br />
●<br />
Cape York Region Package 260.500 ● ● 26.046 55.303 77.052 102.100<br />
Kogan Creek Bridge<br />
6.880 ● ● 6.880<br />
upgrade (as part of the<br />
Bridges Renewal Program)<br />
Vines Creek bridges<br />
28.000 ● 0.726 0.274 0.300 26.700<br />
upgrade 4<br />
Kin Kora intersection<br />
25.050 ● ● 5.350 11.700 8.000<br />
upgrade<br />
Western Roads Upgrade 40.000 ● 19.300 20.700<br />
Program<br />
Dalrymple Road–Bohle<br />
40.000 ● ● 6.500 18.000 15.500<br />
River Bridge 6<br />
Mission Beach Safe<br />
20.767 ● ● 1.623 9.000 10.144<br />
Boating Project<br />
Mareeba Airport upgrade 7 13.000 ● 1.300 4.550 7.150<br />
<strong>State</strong> <strong>Infrastructure</strong> <strong>Plan</strong> Part B: Program<br />
41