We link up Hamburg | Management | Management <strong>Report</strong> | <strong>Annual</strong> Financial Statements | Further Information<br />
3. REPORT ON SUBSEQUENT EVENTS<br />
As of 1 February 2016, Henrik Falk took over as Chairman of the Management Board<br />
from Günter Elste, who retired after twenty years in this function. No further particular<br />
events occurred subsequent to the balance sheet date which might influence the view of<br />
the situation of the company as it is presented in the Management <strong>Report</strong>.<br />
4. FORECAST, RISK AND OPPORTUNITIES REPORT<br />
4.1 Forecast report<br />
U4 line extension<br />
The extension of the U4 U-Bahn line is needed against the background of the planned<br />
and ongoing building development in the HafenCity East. The main component here is<br />
an extension to the route of 1.3 kilometres. This includes a turning loop and sidings in<br />
the immediate vicinity of the existing station as well as an additional station at Elbbrücken<br />
(the bridges over the Elbe), where passengers can change to the rapid transit<br />
network. The overall budget for the measure is € 178.2 million, which will be covered in<br />
its entirety by a grant from the Free and Hanseatic City of Hamburg and/or by funds<br />
made available by the Federal Government under the Local Authority Public Transport<br />
Finance Law (GVFG – Gemeindeverkehrsfinanzierungsgesetz).<br />
The major part of the construction work on the turning loop and sidings took place in <strong>2015</strong>.<br />
With the exception of final installation work in 2016, this means that the plant is now completed.<br />
Operations could commence at the beginning of the year 2016/2017. Work on<br />
building the tunnel and trough section is proceeding according to plan. The shell construction<br />
on both the tunnel and trough section and the station at Elbbrücken was carried out at<br />
the beginning of the year <strong>2015</strong>/2016. Shell construction work at Elbbrücken station is due<br />
to be completed in mid-2016 and on the tunnel and trough section in mid-2017. The subsequent<br />
erection of the station roof with pedestrian bridges and the track crossing inside<br />
the station were commissioned in November <strong>2015</strong>. The project is proceeding within budget<br />
and on schedule. Services on this section of the U4 are due to begin at the end of 2018.<br />
30<br />
Barrier-free conversion of U-Bahn stations<br />
It is a particular concern of the Senate of the Free and Hanseatic City of Hamburg and of<br />
the Hamburger Hochbahn AG to facilitate access to local public transport for persons<br />
who are impaired in their mobility. The main elements in enabling barrier-free access are<br />
the integration of lift facilities, raising the level of platforms and equipping the stations<br />
with orientation aids for visually impaired persons. The entire programme for the conversion<br />
of stations for barrier-free access in the Hamburg metropolitan area is completely<br />
funded by grants from the Free and Hanseatic City of Hamburg. Financing for the<br />
stations in Schleswig-Holstein is enabled by funding from the federal state government<br />
of Schleswig-Holstein, the municipal authorities concerned and the rural district council<br />
of Stormarn. In Stage 1 of the accelerated programme, a total of 21 stations were to be<br />
converted to allow barrier-free access by the end of <strong>2015</strong>.