3. REPORT ON SUBSEQUENT EVENTS<br />

As of 1 February 2016, Henrik Falk took over as Chairman of the Management Board<br />

from Günter Elste, who retired after twenty years in this function. No further particular<br />

events occurred subsequent to the balance sheet date which might influence the view of<br />

the situation of the company as it is presented in the Management <strong>Report</strong>.<br />

4. FORECAST, RISK AND OPPORTUNITIES REPORT<br />

4.1 Forecast report<br />

U4 line extension<br />

The extension of the U4 U-Bahn line is needed against the background of the planned<br />

and ongoing building development in the HafenCity East. The main component here is<br />

an extension to the route of 1.3 kilometres. This includes a turning loop and sidings in<br />

the immediate vicinity of the existing station as well as an additional station at Elbbrücken<br />

(the bridges over the Elbe), where passengers can change to the rapid transit<br />

network. The overall budget for the measure is € 178.2 million, which will be covered in<br />

its entirety by a grant from the Free and Hanseatic City of Hamburg and/or by funds<br />

made available by the Federal Government under the Local Authority Public Transport<br />

Finance Law (GVFG – Gemeindeverkehrsfinanzierungsgesetz).<br />

The major part of the construction work on the turning loop and sidings took place in <strong>2015</strong>.<br />

With the exception of final installation work in 2016, this means that the plant is now completed.<br />

Operations could commence at the beginning of the year 2016/2017. Work on<br />

building the tunnel and trough section is proceeding according to plan. The shell construction<br />

on both the tunnel and trough section and the station at Elbbrücken was carried out at<br />

the beginning of the year <strong>2015</strong>/2016. Shell construction work at Elbbrücken station is due<br />

to be completed in mid-2016 and on the tunnel and trough section in mid-2017. The subsequent<br />

erection of the station roof with pedestrian bridges and the track crossing inside<br />

the station were commissioned in November <strong>2015</strong>. The project is proceeding within budget<br />

and on schedule. Services on this section of the U4 are due to begin at the end of 2018.<br />

30<br />

Barrier-free conversion of U-Bahn stations<br />

It is a particular concern of the Senate of the Free and Hanseatic City of Hamburg and of<br />

the Hamburger Hochbahn AG to facilitate access to local public transport for persons<br />

who are impaired in their mobility. The main elements in enabling barrier-free access are<br />

the integration of lift facilities, raising the level of platforms and equipping the stations<br />

with orientation aids for visually impaired persons. The entire programme for the conversion<br />

of stations for barrier-free access in the Hamburg metropolitan area is completely<br />

funded by grants from the Free and Hanseatic City of Hamburg. Financing for the<br />

stations in Schleswig-Holstein is enabled by funding from the federal state government<br />

of Schleswig-Holstein, the municipal authorities concerned and the rural district council<br />

of Stormarn. In Stage 1 of the accelerated programme, a total of 21 stations were to be<br />

converted to allow barrier-free access by the end of <strong>2015</strong>.