6 Antequera-Granada: HSR Access to Granada HS access to urban<br />
node<br />
7 Algeciras - Bobadilla: Electrification Interoperability<br />
8 Madrid – Algeciras: Enlargement of max. train length to 740 m, UIC gauge<br />
implementation<br />
Interoperability<br />
9 ERTMS deployment on the entire alignment of the <strong>Mediterranean</strong> Corridor ERTMS Deployment<br />
10 Rail/Road improvements in Tarragona, Barcelona, Cartagena, Valencia,<br />
Sevilla and Algeciras Seaports<br />
Last mile connections<br />
to Seaports<br />
Remaining critical issues<br />
Despite Spain's efforts to expand the UIC gauge on its conventional rail network, it is not<br />
to be expected that the UIC track gauge will be deployed completely by 2030 on the<br />
conventional lines.<br />
In addition, connecting the Spanish core airports with the TEN-T railway network as<br />
recommended by the EU represents another challenge that shall be addressed.<br />
FRANCE<br />
Current status<br />
The most relevant critical issues are related to:<br />
a) missing HS railway link between Montpellier and Perpignan, as well as the<br />
foreseen HS line Lyon-Turin<br />
b) the low standards of the conventional line Lyon-Turin that penalise especially<br />
the freight trains in terms of productivity<br />
c) the urban nodes of Lyon and Marseille are characterized by a high promiscuity<br />
of rail traffic due to overlapping of metropolitan, regional, long distance and<br />
freight traffic<br />
d) the need of upgrading road and rail last mile links to the port facilities of Fos<br />
and Marseille in order to accommodate the forecasted traffic flows<br />
e) the lack of capacity on the railway lines: ES border- Perpignan – Montpellier –<br />
Nîmes and Valence-Grenoble- Chambéry<br />
f) currently none of the existing lines is equipped with the ERTMS signalling<br />
system except for the cross border high speed line Le Pertus -Perpignan.<br />
g) The canal linking the Rhône near Fos-sur-Mer and the port of Sète needs several<br />
improvements to reach TEN-T standards (from CEMT class III to IV) and to<br />
increase its performances.<br />
On-going and planned main interventions<br />
The following map depicts the matching between the identified critical issues and the ongoing<br />
and/or planned interventions included in the Corridor Project list. Between these,<br />
concerning railway projects, the ones with the biggest KPI contribution have been<br />
33