6 Antequera-Granada: HSR Access to Granada HS access to urban<br />

node<br />

7 Algeciras - Bobadilla: Electrification Interoperability<br />

8 Madrid – Algeciras: Enlargement of max. train length to 740 m, UIC gauge<br />

implementation<br />

Interoperability<br />

9 ERTMS deployment on the entire alignment of the <strong>Mediterranean</strong> Corridor ERTMS Deployment<br />

10 Rail/Road improvements in Tarragona, Barcelona, Cartagena, Valencia,<br />

Sevilla and Algeciras Seaports<br />

Last mile connections<br />

to Seaports<br />

Remaining critical issues<br />

Despite Spain's efforts to expand the UIC gauge on its conventional rail network, it is not<br />

to be expected that the UIC track gauge will be deployed completely by 2030 on the<br />

conventional lines.<br />

In addition, connecting the Spanish core airports with the TEN-T railway network as<br />

recommended by the EU represents another challenge that shall be addressed.<br />

FRANCE<br />

Current status<br />

The most relevant critical issues are related to:<br />

a) missing HS railway link between Montpellier and Perpignan, as well as the<br />

foreseen HS line Lyon-Turin<br />

b) the low standards of the conventional line Lyon-Turin that penalise especially<br />

the freight trains in terms of productivity<br />

c) the urban nodes of Lyon and Marseille are characterized by a high promiscuity<br />

of rail traffic due to overlapping of metropolitan, regional, long distance and<br />

freight traffic<br />

d) the need of upgrading road and rail last mile links to the port facilities of Fos<br />

and Marseille in order to accommodate the forecasted traffic flows<br />

e) the lack of capacity on the railway lines: ES border- Perpignan – Montpellier –<br />

Nîmes and Valence-Grenoble- Chambéry<br />

f) currently none of the existing lines is equipped with the ERTMS signalling<br />

system except for the cross border high speed line Le Pertus -Perpignan.<br />

g) The canal linking the Rhône near Fos-sur-Mer and the port of Sète needs several<br />

improvements to reach TEN-T standards (from CEMT class III to IV) and to<br />

increase its performances.<br />

On-going and planned main interventions<br />

The following map depicts the matching between the identified critical issues and the ongoing<br />

and/or planned interventions included in the Corridor Project list. Between these,<br />

concerning railway projects, the ones with the biggest KPI contribution have been<br />