f) Missing rail last mile connection to the airport of Budapest.<br />

On-going and planned main interventions<br />

The following map depicts the matching between the detected critical issues and the ongoing<br />

and/or planned interventions reported in the Corridor Project list.<br />

4<br />

Several railway sections<br />

projects related to ERTMS, GSM - R, ETCS<br />

and track upgrading – 21 listed rail project<br />

A<br />

A<br />

L<br />

Budapest<br />

A<br />

1<br />

3 2<br />

A<br />

Rail: Compliance by 2030<br />

L<br />

A<br />

HUNGARY<br />

Compliant<br />

Works on - going, compliance expected<br />

Works still to be to started, compliance expected<br />

Works foreseen but delayed, compliance doubted<br />

Works not yet planned/agreed<br />

Reason for non - compliance<br />

E No ‘Electrification’<br />

L ‘Line speed < 100 km/h’<br />

A ‘Axle load < 22.5 tonnes’<br />

‘UIC gauge ? 1,435 mm’<br />

G<br />

for completion<br />

Status: June 2016<br />

Figure 17 –Hungarian sections compliance by 2030 and main project impacting on KPI<br />

Project n. General description of the interventions with the biggest KPI<br />

contribution<br />

1 Completion of the full Western section of the “M0” motorway ring<br />

around Budapest<br />

2 Budapest Liszt Ferenc International Airport: building planned<br />

railway connections;<br />

3 Budapest Southern Danube Railway Bridge and connected line –<br />

reconstruction & extension to 3 tracks<br />

4 Several railway projects related to ERTMS, GSM-R, ETCS and track<br />

upgrading (i.e. Budapest – Gyékényes and Budapest -Záhony).<br />

Critical issue<br />

addressed<br />

C apacity bottleneck<br />

Last mile connection<br />

C apacity bottleneck<br />

ERTMS Deployment,<br />

capacity bottleneck,<br />

interoperability<br />

Remaining critical issues<br />

Nevertheless, as depicted in the above image, the most critical bottlenecks which are not<br />

expected to be solved by 2030 14 concern the upgrading of the railway sections<br />

Gyekenyes- Pusztaszabolcs and Boba – Szekesfehervar to EU standards. In addition, this<br />

estimation allows understanding if the selected projects contribute significantly to reach<br />

the targets set by the Regulation for 2030, or if additional projects are still needed to<br />

meet the infrastructure requirements defined under the Regulation.<br />

14 It should be noted that some projects with a planned end date close to 2030 have a low<br />

maturity level and also unsecure financing, which could lead to delays in the project, meaning<br />

that the KPIs presented might have lower compliance rates when compared to the figures<br />

presented in the following tables.<br />

41